Laserfiche WebLink
ENGINEERING AND TRANSPORTATION <br />Current Fee Reference <br />Proposed Fee <br />Explanation <br />1 General Encroachment <br />A. Permit <br />B.1 Inspection/Plan Review/Permit Issuance <br />B.2 Permit+ Inspection Fee <br />I ISUMC 5-1-225 <br />$65.00 <br />Inspection = $125.00/hour; <br />Plan Check Engineer = $152.00/hour; <br />Technical Assistance = $103.00/hour; <br />Senior Engineer = $186.00/hour; <br />Principal Engineer = $205.00/hour, <br />Direct Costs for Plan Check Services Consultant <br />$65 (Permit) + 1.5 hours (Minimum Inspection Time) <br />estimated inspection requirements = 1.5 hours <br />Inspection = $129.00/hour; <br />Plan Check Engineer= $157.00/hour; <br />Technical Assistance = $106.00/hour; <br />Senior Engineer = $192.00/hour; <br />Principal Engineer= $211.00/hour <br />C. Parklet Program <br />--Application Fee <br />$150 <br />-- Design Review Deposit <br />As determined by City Engineer <br />-- Restoration Deposit <br />$2,500 <br />--Ins ection <br />$125.00/hour <br />$129.00/hour <br />-- Plan Review <br />$152.00/hour <br />$157.00/hour <br />D. Inspection/Security/Plan Review Deposit <br />As determined by City Engineer to insure prompt, <br />high quality repairs and to cover estimated <br />E. No Permit Penalty Fee <br />Double Inspection Fee and Permit Fee <br />F. Annual Sidewalk Repair Program - Sidewalk Inspection <br />Cost of work performed by the City contractor or as SLAC §8.1.120 <br />described in SLAC §8.1.120 "Repairs" <br />G. Agreement <br />Direct Costs 1 <br />H. Overhead Banner Installation and Removal <br />$150.00 <br />I. News rack Permit <br />$55.00 + $5.50 per news rack <br />Maintenance Deposit <br />$100.00+ $5.00 per news rack <br />2 Subdivision: <br />A. Parcel Map Waiver/Lot Line Adjustment/ or Certificate of Compliance <br />Direct Costs (1); $1,600 initial deposit <br />B. Parcel Map <br />Direct Costs (1); $4,000 plus $100 per lot initial deposit <br />C. Tentative/Final Map <br />Direct Costs 1 <br />D. Subdivision Improvement Plan Review <br />Direct Costs (1) <br />3 Building Permits: <br />A. Plan Review <br />Direct Costs (1); $65.00 minimum <br />B. Agreement Preparation <br />Direct Costs 1 <br />4 Large Format Copies (see also Community Development Dept.) <br />$10.00 for first sheet and $2.00 for each sheet thereafter plus Direct Costs (1) <br />5 Park Facilities Development Impact Fees 2 <br />SLMC §7-13-100 <br />Park Land Acquisition Fee: <br />SLAC §8.8.100 <br />Single Family <br />$16,781 SLMC§7-1-820 <br />$17,301 <br />Engineering News Records CPI 3.1% <br />Multi-Family <br />$14,667 <br />$15,122 <br />Engineering News Records CPI 3.1% <br />Special Unit <br />1$7,334 <br />$7,562 <br />Engineering News Records CPI 3.1% <br />Accessory Dwelling Unit (3) <br />$6,356 <br />$6,554 maximum (No fee when < 750 sq. JL/ <br />Engineering News Records CPI 3.1% <br />Park Improvement Fee: <br />Single Family <br />$2,686 <br />$2,730 <br />Engineering News Records CPI 3.1% <br />Multi-Family <br />$2,348 <br />$2,387 <br />Engineering News Records CPI 3.1% <br />Special Unit <br />1$1,173 <br />$1,193 <br />Engineering News Records CPI 3.1% <br />Accessory Dwelling Unit (3) <br />$1,017 <br />$1,034 maximum (No fee when <750 sq. ftl <br />Engineering News Records CPI 3.1% <br />Total Acquisition and Improvement Fee: <br />Single Family <br />$19,466 <br />$20,031 <br />Engineering News Records CPI 3.1% <br />Multi-Family <br />$17,014 <br />$17,509 <br />Engineering News Records CPI 3.1% <br />Special Unit <br />$8,508 <br />$8,755 <br />Engineering News Records CPI 3.1% <br />Accessory Dwelling Unit (3) <br />$7,374 <br />$7,588 maximum (No fee when <750 sq. JL/ <br />Engineering News Records CPI 3.1% <br />6 Grading Permits: <br />A. Permit <br />$65 <br />B. Inspection <br />$125.00/hour <br />$129.00/hour <br />C. Inspection Deposit <br />As determined by City Engineer <br />D. Plan Review <br />Plan Check Engineer = $152.00/hour; <br />Plan Check Engineer= $157.00/hour; <br />Principal Engineer = $205.00/hour <br />Principal Engineer= $211.00/hour <br />E. Performance Bond <br />As determined by City Engineer SLMC §7-12-605 <br />F. Erosion and Sediment Control Bond <br />Estimated cost for erosion and sediment control SLMC §7-12-610 <br />7 Public Works Projects: <br />A. City Standard Plans (Printed or CD) <br />$10.00 <br />B. Bidder: City Projects Plans & Specification Documents purchased at City Hall <br />Direct Costs rounded to nearest $5 or a minimum of $25.00 <br />C. Bidder: City Project Plans & Specification Documents purchased via mail <br />Direct Costs (rounded to nearest $5) or a minimum of $25.00+ mailing costs <br />8 Overhead Utility Conversion <br />A. Residential Development <br />Lesser of: SLMC §5-3-325 <br />i) Actual cost per linear foot of property frontage, or Underground Utility District Master Plan <br />ii) $1,583.33 per dwelling unit, or <br />ill $1,609.71 per dwelling unit or <br />1.70% <br />iii) $396.20/LF of property frontage <br />IN $402.80/LF of property frontage <br />1.70% <br />B. Non-Residential Development <br />Lesser of: <br />I) Actual cost per linear foot of property frontage, or <br />ii) $396.20/LF of property frontage <br />ii) $402.80ILF ofproperty frontage <br />1.70% <br />9 City Property Use Application Fee <br />Direct Costs (1) <br />(1) Direct Costs: Hourly personnel charge plus a factor of 33% for benefits, 54% for indirect overhead charges and 87% for staff support charges. <br />(2) Park Development Fees created with Reso. 2000-64, and amended with Reso. 2005-069 & Reso. 2019-074. <br />(3) Impact fee for ADUs 750 sq. ft. or larger shall be charged proportionately in relation <br />to the size of the primary dwelling unit per CA Gov't Code Section 65852.2. <br />lNewnote <br />