Laserfiche WebLink
Description Current Fee Reference Proposed Fee Explanation <br />ENGINEERING AND TRANSPORTATION DEPARTMENT <br />1 General Encroachment SLMC §5-1-225 <br />A. Permit $65.00 <br />B.1 Inspection/Plan Review/Permit Issuance Inspection = $125.00/hour;Inspection = $129.00/hour; <br />Plan Check Engineer = $152.00/hour;Plan Check Engineer = $157.00/hour; <br />Technical Assistance = $103.00/hour;Technical Assistance = $106.00/hour; <br />Senior Engineer = $186.00/hour;Senior Engineer = $192.00/hour; <br />Principal Engineer = $205.00/hour;Principal Engineer = $211.00/hour <br />Direct Costs for Plan Check Services Consultant <br />B.2 Permit + Inspection Fee $65 (Permit) + 1.5 hours (Minimum Inspection Time) <br />(estimated inspection requirements = 1.5 hours <br />determined by City Engineer) <br />C. Parklet Program <br />-- Application Fee $150 <br />-- Design Review Deposit As determined by City Engineer <br />-- Restoration Deposit $2,500 <br />-- Inspection $125.00/hour $129.00/hour <br />-- Plan Review $152.00/hour $157.00/hour <br />D. Inspection/Security/Plan Review Deposit As determined by City Engineer to insure prompt, high <br />quality repairs and to cover estimated inspection costs <br />and plan review cost.E. No Permit Penalty Fee Double Inspection Fee and Permit Fee <br />F. Annual Sidewalk Repair Program - Sidewalk Inspection Cost of work performed by the City contractor or as <br />described in SLAC §8.1.120 "Repairs" <br />SLAC §8.1.120 <br />G. Agreement Direct Costs (1) <br />H. Overhead Banner Installation and Removal $150.00 <br />I. News rack Permit $55.00 + $5.50 per news rack <br /> Maintenance Deposit $100.00 + $5.00 per news rack <br />2 Subdivision: <br />A. Parcel Map Waiver/Lot Line Adjustment/ or Certificate of Compliance Direct Costs (1); $1,600 initial deposit <br />B. Parcel Map Direct Costs (1); $4,000 plus $100 per lot initial deposit <br />C. Tentative/Final Map Direct Costs (1) <br />D. Subdivision Improvement Plan Review Direct Costs (1) <br />3 Building Permits: <br />A. Plan Review Direct Costs (1); $65.00 minimum <br />B. Agreement Preparation Direct Costs (1) <br />4 Large Format Copies (see also Community Development Dept.)$10.00 for first sheet and $2.00 for each sheet thereafter plus Direct Costs (1) <br />5 Park Facilities Development Impact Fees (2)SLMC §7-13-100 <br /> Park Land Acquisition Fee:SLAC §8.8.100 <br /> Single Family <br />$16,781 SLMC §7-1-820 $17,301 <br />Engineering News Records CPI 3.1% <br /> Multi-Family <br />$14,667 $15,122 <br />Engineering News Records CPI 3.1% <br /> Special Unit <br />$7,334 $7,562 <br />Engineering News Records CPI 3.1% <br /> Accessory Dwelling Unit (3)$6,356 $6,554 maximum (No fee when < 750 sq. ft.) <br />Engineering News Records CPI 3.1% <br /> Park Improvement Fee: <br /> Single Family <br />$2,686 $2,730 <br />Engineering News Records CPI 3.1% <br /> Multi-Family <br />$2,348 $2,387 <br />Engineering News Records CPI 3.1% <br /> Special Unit <br />$1,173 $1,193 <br />Engineering News Records CPI 3.1% <br /> Accessory Dwelling Unit (3)$1,017 $1,034 maximum (No fee when < 750 sq. ft.) <br />Engineering News Records CPI 3.1% <br /> Total Acquisition and Improvement Fee: <br /> Single Family <br />$19,466 $20,031 <br />Engineering News Records CPI 3.1% <br /> Multi-Family <br />$17,014 $17,509 <br />Engineering News Records CPI 3.1% <br /> Special Unit <br />$8,508 $8,755 <br />Engineering News Records CPI 3.1% <br /> Accessory Dwelling Unit (3)$7,374 $7,588 maximum (No fee when < 750 sq. ft.) <br />Engineering News Records CPI 3.1% <br />6 Grading Permits: <br />A. Permit $65 <br />B. Inspection $125.00/hour $129.00/hour <br />C. Inspection Deposit As determined by City Engineer <br />D. Plan Review Plan Check Engineer = $152.00/hour;Plan Check Engineer = $157.00/hour; <br />Principal Engineer = $205.00/hour Principal Engineer = $211.00/hour <br />E. Performance Bond As determined by City Engineer SLMC §7-12-605 <br />F. Erosion and Sediment Control Bond Estimated cost for erosion and sediment control SLMC §7-12-610 <br />7 Public Works Projects: <br />A. City Standard Plans (Printed or CD)$10.00 <br />B. Bidder: City Projects Plans & Specification Documents purchased at City Hall Direct Costs (rounded to nearest $5) or a minimum of $25.00 <br />C. Bidder: City Project Plans & Specification Documents purchased via mail Direct Costs (rounded to nearest $5) or a minimum of $25.00 + mailing costs <br />8 Overhead Utility Conversion <br />A. Residential Development Lesser of:SLMC §5-3-325 <br />i) Actual cost per linear foot of property frontage, or Underground Utility District Master Plan <br />ii) $1,583.33 per dwelling unit, or ii) $1,609.71 per dwelling unit, or 1.70% <br />iii) $396.20/LF of property frontage iii) $402.80/LF of property frontage 1.70% <br />B. Non-Residential Development Lesser of: <br />i) Actual cost per linear foot of property frontage, or <br />ii) $396.20/LF of property frontage ii) $402.80/LF of property frontage 1.70% <br />9 City Property Use Application Fee Direct Costs (1) <br />(1) Direct Costs: Hourly personnel charge plus a factor of 33% for benefits, 54% for indirect overhead charges and 87% for staff support charges. <br />(2) Park Development Fees created with Reso. 2000-64, and amended with Reso. 2005-069 & Reso. 2019-074. <br />(3) Impact fee for ADUs 750 sq. ft. or larger shall be charged proportionately in relation to the size of the primary dwelling unit, per CA Gov't Code Section 65852.2.New note <br />480