My WebLink
|
Help
|
About
|
Sign Out
Home
8B Consent 2020 0615
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0615
>
8B Consent 2020 0615
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:38:01 PM
Creation date
6/10/2020 2:37:43 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/15/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Description Current Fee Reference Proposed Fee Explanation <br />PUBLIC WORKS SERVICES DEPARTMENT – Environmental Services Section <br />1 Hazardous Materials Storage SLMC 3-3-300 <br />A. Annual fees for storage of combustible liquids, corrosives, flammable gases, <br />flammable liquids, flammable solids, nonflammable gases, organic peroxides, <br />other regulated materials, oxidizers, poisonous gasses, poisonous materials (1) <br />Quantity Range 1 $ 128.00 Quantity Range 1 $132.00 Increase by 3.31% CPI rounded to whole dollar <br />Quantity Range 2 $257.00 Quantity Range 2 $266.00 Increase by 3.31% CPI rounded to whole dollar <br />Quantity Range 3 $370.00 Quantity Range 3 $382.00 Increase by 3.31% CPI rounded to whole dollar <br />Quantity Range 4 $483.00 Quantity Range 4 $499.00 Increase by 3.31% CPI rounded to whole dollar <br />Quantity Range 5 $603.00 Quantity Range 5 $623.00 Increase by 3.31% CPI rounded to whole dollar <br />B. Annual Fees for Storage of Radioactive Materials (1)$178.00 $184.00 Increase by 3.31% CPI rounded to whole dollar <br />C. Aboveground Tank Installation Permit (2) <br /> First Tank $941.00 $972.00 Increase by 3.31% CPI rounded to whole dollar <br /> Each Additional $314.00 $324.00 Increase by 3.31% CPI rounded to whole dollar <br />D. APSA Facility Annual Fee <br /> Qualified Facility (Tier I/Tier II)$157.00 $162.00 Increase by 3.31% CPI rounded to whole dollar <br /> Non-Qualified Facility (full SPCC)$276.00 $285.00 Increase by 3.31% CPI rounded to whole dollar <br />2 Accidental Release Program:SLMC 3-3-300 <br /> Additional Review by City Staff $157.00/hour $162.00/hour Increase by 3.31% CPI rounded to whole dollar <br /> Additional Review by third party Direct Costs plus 10%Direct Costs + 10%Increase by 3.31% CPI rounded to whole dollar <br /> Annual Fee: <br /> Program 1 $612.00 $632.00 Increase by 3.31% CPI rounded to whole dollar <br /> Program 2 $796.00 $822.00 Increase by 3.31% CPI rounded to whole dollar <br /> Program 3 $1,032.00 $1,066.00 Increase by 3.31% CPI rounded to whole dollar <br /> Program 4 $1,549.00 $1,600.00 Increase by 3.31% CPI rounded to whole dollar <br />3 Underground Hazardous Materials Storage SLMC 3-3-300 <br />A. Annual Operating Permit: Each Tank $135.00 $139.00 Increase by 3.31% CPI rounded to whole dollar <br />B. New Tank Installation (2) <br />· First Tank $2,822.00 $2,915.00 Increase by 3.31% CPI rounded to whole dollar <br />· Each Additional $314.00 $324.00 Increase by 3.31% CPI rounded to whole dollar <br />C. Tank Removal, Repair, Alterations (2) <br />· First Tank $1,568.00 $1,620.00 Increase by 3.31% CPI rounded to whole dollar <br /> Each Additional $250.00 $258.00 Increase by 3.31% CPI rounded to whole dollar <br />D. Minor Repairs and Alterations Hourly Rate $157.00/hour $162.00/hour Increase by 3.31% CPI rounded to whole dollar <br />4 Hazardous Waste On-site Treatment:CA Health & Safety Code; Title 27 <br /> Annual Fees: <br /> Permit-by-Rule $1,166.00 $1,205.00 Increase by 3.31% CPI rounded to whole dollar <br /> Conditional Authorization $498.00 $514.00 Increase by 3.31% CPI rounded to whole dollar <br /> Conditional Exempt $135.00 $139.00 Increase by 3.31% CPI rounded to whole dollar <br />5 Hazardous Waste Generators CA Health & Safety Code; Title 27 <br />A. Annual Fees for Generators of Hazardous Waste (3)$178.00 - CESQG $184.00 - CESQG Increase by 3.31% CPI rounded to whole dollar <br />$357.00 - SQG $369.00 - SQG Increase by 3.31% CPI rounded to whole dollar <br />$641.00 - LQG $662.00 - LQG Increase by 3.31% CPI rounded to whole dollar <br />$178.00 - UWG $184.00 - UWG Increase by 3.31% CPI rounded to whole dollar <br />$89.00 - CESQG 0 $92.00 - CESQG0 Increase by 3.31% CPI rounded to whole dollar <br />6 CalEPA CUPA Surcharge Fee As required by State of California CA Health & Safety Code; Title 27 <br />7 File Review :SLAC 6.4.100 <br />A. Photocopying See City-Wide <br />B. Copies of Site Lists $157.00/list <br />8 Plan Review :SLMC 3-3-100 <br />A. City Staff Hourly Rate $157.00/hr.$162.00/hour Increase by 3.31% CPI rounded to whole dollar <br />B. Outside Contractor Direct Costs plus + 10% <br />C. Recycling Program $157.00/hr Moved to "8. Solid Waste & Recycling" <br />D. Waste Management Plan $104.00 Moved to "8. Solid Waste & Recycling" <br />9 Wastewater Pretreatment:No change for FY 21 in Section 9 <br />A. All Users SLMC 3-15-510 <br />Service Charge – Per Connection SLAC 12.5.110(e) <br />-- Weekly Activity $1,831.00 per month <br />-- Semi-Monthly Activity $915.00 per month <br />-- Monthly Activity $458.00 per month <br />-- Bi-Monthly Activity $229.00 per month <br />-- Quarterly Activity $153.00 per month <br />-- Semi-Annual Activity $76.00 per month <br />-- Annual Activity $38.00 per month <br />492
The URL can be used to link to this page
Your browser does not support the video tag.