My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2020 0615
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0615
>
8E Consent 2020 0615
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:38:10 PM
Creation date
6/10/2020 2:38:06 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/15/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 20-116 <br />Applicable General Plan Policies <br />Transportation Goal T-2 Design and operate streets to be safe, attractive, and accessible for <br />all transportation users whether they are pedestrians, bicyclists, transit riders or motorists, <br />regardless of age or ability. <br />Transportation Goal T-3 Promote and accommodate alternative, environmentally-friendly <br />methods of transportation, such as walking and bicycling. <br />Transportation Goal T-5 Improve major transportation arteries for circulation in and around the <br />city. <br />Environmental Review <br />This project is categorically exempt from California Environmental Quality Act (CEQA) per <br />Section 15301(c) of the CEQA guidelines. The Notice of Exemption was filed with the Alameda <br />County Recorder on February 7, 2020. <br />Summary of Public Outreach Efforts <br />·The Notice to Bidders was published in the Daily Review, the South County Post, Visión <br />Hispana and Sing Tao. <br />·Staff also notified twenty-three builders’ exchanges and construction data firms as well as <br />a list of contractors that asked to be notified of bidding opportunities via email. <br />·The project is described on the Engineering and Transportation Department website. <br />Two mandatory pre-bid meetings were held on April 16 and April 20, 2020. The intent of these <br />meetings was to inform bidders of the project details, including the City’s Local Inclusion <br />Ordinance and the CWA. <br />Prior to construction, staff will notify the residents in the immediate proximity of the work areas. <br />The contractor will also provide notification in the form of door hangers immediately before the <br />work. <br />Fiscal Impacts <br />The total project cost is estimated at $3,500,000 as follows: <br />Design and Bid (ramps, seal, sewer): $125,000 <br />Construction Contract Curb Ramps:$339,588 <br />Construction Contingency Curb Ramps $84,895 <br />Construction Contract Pavement Sealing:$1,670,000 <br />Construction Contingency Pavement Sealing $200,400 <br />Construction Contract Sanitary Sewer Point repair $728,000 <br />Construction Contingency Sewer Point Repairs: $182,000 <br />Construction Management and Inspection (ramps, seal, sewer):$170,117 <br />Page 3 City of San Leandro Printed on 6/10/2020 <br />515
The URL can be used to link to this page
Your browser does not support the video tag.