|
BID SUMMARY BID OPENINGDATE: Wednesday, May 6, 2020Date Approved: TIME: 2:00 p.m.Prepared by: J. O'DriscollLOCATION: City Clerk's OfficeITEMNO.ITEM UNIT COST ITEM COST1 Mobilization, Staging & Stockpiling per Sections 7-8.4 & 9-341 LS$40,000.00 $40,000.002 Temporary Traffic Control per Section 6001 LS$40,000.00 $40,000.003 Install Curb and Gutter per City Standard Plan No. 1001,080 LF$80.00 $86,400.004 Install Wheelchair Curb Cut Ramp per City Standard Plan Nos. 106A and 106B4,150 SF$33.00 $136,950.005 Install Sidewalk per City Standard Plan No. 1001,820 SF$24.00 $43,680.006 Install Concrete Apron per City Standard Plan No. 114280 SF$38.00 $10,640.007 Install Concrete Valley Gutter per City Standard Plan No. 114300 SF$49.00 $14,700.008 Install Asphalt Concrete Tie-ins per City Standard Plan Nos. 100 & 114995 CF$42.00 $41,790.009 Install Wet Set Truncated Dome Panel per City Standard Plan No. 106D2 EA$2,000.00 $4,000.0010 Adjust Utility Box to Grade per Section 301-1.64 EA$500.00 $2,000.0011 Relocate Roadside Sign and Post per Section 3152 EA$550.00 $1,100.0012 Relocate Roadside Sign on New Post per Section 3159 EA$650.00 $5,850.0013 Paint Curb Red per Section 314-4 1 LF$3,000.00 $3,000.00Curb Ramp Upgrade PhasePROJECT TITLE:PROJECT NO.:BID NO.:QUANTITYAnnual Street Sealing 2019-202020.007019-20.012ENGINEER'S ESTIMATESposeto Engineering, Inc. Ray's Electric4558 Contractors Place 411 Pendleton Way, Suite BLivermore, CA 94551 Oakland, CA 94621Phone: (925) 443-4200 Phone: (510) 577-7700Fax: (925) 443-6800 Fax: (510) 577-7706UNIT COST UNIT COST$19,000.00 $19,000.00 $60,000.00 $60,000.00$20,060.00 $20,060.00 $80,000.00 $80,000.00$76.00 $82,080.00 $100.00 $108,000.00$29.00 $120,350.00 $50.00 $207,500.00$19.00 $34,580.00 $40.00 $72,800.00$28.00 $7,840.00 $50.00 $14,000.00$28.00 $8,400.00 $45.00 $13,500.00$76.00 $75,620.00 $32.00 $31,840.00$1,225.00 $2,450.00 $1,500.00 $3,000.00$160.00 $640.00 $1,000.00 $4,000.00$307.00 $614.00 $1,000.00 $2,000.00$452.00 $4,068.00 $600.00 $5,400.00$7,850.00 $7,850.00 $5,000.00 $5,000.00ITEM COSTITEM COSTBid Summary - Annual Street Sealing 19-20, Curb Ramp Upgrade PhasePage 5 of 6Printed 5/8/2020 @ 3:02 PM521
|