My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent 2020 0615
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0615
>
8L Consent 2020 0615
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:39:45 PM
Creation date
6/10/2020 2:38:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/15/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 20-217 <br />There is no exchange of money between EBDA and the City at this time. However, as noted at <br />the November 18, 2019 City Council meeting, the City will no longer be required to share in the <br />cost of pipelines or pump stations for other member agencies. The City will be responsible for all <br />costs associated with the pump station located at the San Leandro Water Pollution Control Plant <br />and the pipeline between the pump station and the EBDA discharge facility. Staff expects there <br />will be a small net savings as a result of efficiencies gained by maintaining these facilities with <br />City staff. <br />ATTACHMENTS <br />Attachments to Related Legislative Files <br />Attached to Resolution: <br />o Transfer Agreement San Leandro Pump Station and Pipelines to Force Main <br />PREPARED BY: Justin Jenson, Water Pollution Control Plant Manager <br />Hayes Morehouse, Water Pollution Control Plant Administrative Analyst II <br />Page 2 City of San Leandro Printed on 6/10/2020 <br />659
The URL can be used to link to this page
Your browser does not support the video tag.