My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent 2020 0615
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0615
>
8L Consent 2020 0615
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:39:45 PM
Creation date
6/10/2020 2:38:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/15/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />-20- <br />15966623.2 <br />Cost activities, will be allocated based on Maximum Flow Rate Capacity as set forth in Schedule <br />H, which excludes San Leandro. <br />(2) Capital Costs related to the Transport System which exceed a total cost of <br />$35,000 per project, plus allocated general administrative expenses attributable to those Capital <br />Cost activities, will be allocated: (i) based on Maximum Flow Rate Capacity as set forth in <br />Schedule H, which excludes San Leandro, until a total of three hundred and twenty-five thousand <br />dollars ($325,000) has been expended for projects not approved as of July 1, 2020, and thereafter <br />(ii) based on each Agency's use of the segment of pipeline as set forth in Schedule G; provided, <br />however, that any unexpended portion of the $325,000 limit will be adjusted annually to reflect <br />any increase in the cost of construction of similar projects as established by the Engineering <br />News-Record 20-City Building Cost Index using July 1, 2020 as the baseline. Notwithstanding <br />the above, costs associated with Failures will be allocated as set forth in Section 10. <br />(3) Capital Costs related to the Bay Outfall, the Operations Center, and the <br />Marina Dechlorination Facility which exceed a total cost of $10,000 per project, plus allocated <br />general administrative expenses attributable to such Capital Cost activities will be allocated <br />based on Maximum Flow Rate Capacity for all Agencies, as set forth in the Fixed Operation and <br />Maintenance Costs allocation in Schedule B. <br />(c) Allocation of Planning and Special Studies Costs. <br /> Planning and Special Studies Costs will be allocated to each Agency as set forth in <br />Schedule C. <br />(d) Capital Costs Allocated as Operation and Maintenance Costs. <br /> Except as otherwise provided herein, Capital Costs for Facilities other than Union <br />Effluent Pump Station that total less than $10,000 per project (for non-Transport System <br />projects) or less than $35,000 (for Transport System projects) will be allocated in the same <br />fashion as Operation and Maintenance Costs under Section 12(a) of this Agreement. The <br />Authority may not divide work into small projects for the purpose of allocating project costs as <br />Operation and Maintenance Costs, rather than as Capital Costs. <br />690
The URL can be used to link to this page
Your browser does not support the video tag.