My WebLink
|
Help
|
About
|
Sign Out
Home
8M Consent 2020 0615
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0615
>
8M Consent 2020 0615
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:40:08 PM
Creation date
6/10/2020 2:39:45 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/15/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Quotation <br />2286 E. Date Ave. <br />Fresno,CA 93706 <br />Phone: 559-237-5541 <br />Fax: 559-237-5554 <br />www.SEINC.com <br />203918 <br />User:Uribe,Ruben <br />HAZ MAT- HWD <br />FEE <br />WEIGHT <br />CERTIFICATE <br />TRANSPORTATION ONE WAY TO SAN LEANDRO,CA <br />48" X 18" X 18" UNDERBODY RECESSED MOUNTED TOOLBOXES (1EA) <br />SIDE @ FRONT - PAINTED WHITE <br />HAZARDOUS WASTE DISPOSAL FEE <br />$0.002 TOOLBOX <br />$30.00 <br />WEIGHT CERTIFICATE OF COMPLETED UNIT $35.00 <br />$433.00 <br />Sub Total $15,335.00 <br />Sales Tax $0.00 <br />Total $15,335.00 <br />DISCLAIMERS <br />TERMS: Standard terms are Net 10 Days,any deviations need to be in writing before produciton <br />CHANGES:Each change after quote is accepted will constitute a $500.00 fee in addition to the cost of the change <br />No changes will be made to orders 2 weeks prior to production start date <br />DRAWINGS:Any changes to drawings after acceptance and 2 weeks prior to production start date will constitute a $500.00 <br />fee or more at $150.00 per hour <br />No changes will be made to drawings 2 weeks prior to production start date <br />PAINT: Scelzi Enterprises,Inc.does not guarantee a perfect color match due to inconsistencies in factory paints and <br />procedures <br />Paymentinfull on completionofjob if creditarrangementshave not been madein advance <br />DATE <br />Estimate <br />PreparedBy: <br />SalesRep:Uribe, <br />Ruben <br />THISWORK AUTHORIZEDBY <br />The abovequotationis submittedaccordingto specifications submittedby customer.Any alterationsor changes increasing <br />production costswill be chargedfor accordingly. <br />https:llportal.seinc.com/Pages/Quotes/QuoteView.html?cbResetParam=1&QuoteID=EACBFYAAHFTW 2/2770
The URL can be used to link to this page
Your browser does not support the video tag.