My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2020-058 Amend Title 6 Ch 4 of AC for Fees and Charges by CD
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2020
>
Reso 2020-058 Amend Title 6 Ch 4 of AC for Fees and Charges by CD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 12:18:46 PM
Creation date
6/22/2020 12:09:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
6/15/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Description <br />vii) Residential Seismic Retrofit projects using "Plan set A" (for one and two family residences) $75 plus Filing and Issuance Fee and other miscellaneous fees <br />viii) Photovoltaic Systems <br />a) Residential <br />Reference ProposedFe Explanation <br />$77 3.3%CPI increase <br />i) Up to 15kW <br />$287 <br />$296 <br />3.3% CPI Increase <br />ii) each additional kW over 15kW <br />$15 <br />$16 <br />3.3% CPI increase <br />b) Commercial <br />i)Up to 25kW <br />$400 <br />$413 <br />3.3% CPI Increase <br />ii) 26kW-50kW <br />$600 <br />$620 <br />3.3% CPI Increase <br />iii) each additional kW (51kW-250kW) <br />$7 <br />iv) each additional kW over 250kW <br />$5 <br />Note: For photovoltaic systems, total permit fees, including applicable Permit Issuance and Filing Fees, <br />Automation Fees, Community Planning Fees, and other mandated fees shall not exceed amounts <br />authorized via Government Code Section 66015. <br />ix) Signs <br />Sign permit fees are based on all signs being on the same property and on the same permit. <br />a) 1st Non -energized sign attached to building. <br />$107 <br />$111 <br />3.3% CPI increase <br />b) each additional sign thereafter: <br />$54 <br />$56 <br />3.3% CPI increase <br />c) Pylon sign, energized or not, each: <br />$226 <br />$233 <br />3.3% CPI increase <br />d) Monument sign, energized or not, each <br />$169 <br />$175 <br />3.3% CPI increase <br />e) Relocation or alteration of any sign electronically or mechanically, but not including <br />replacement of tubing, transformers and such parts subject to failure; or shop inspection by <br />the local inspection department in lieu of a UL label (a local electrical inspection <br />department label of approval shall be required), each <br />$85 <br />$88 <br />3.3% CPI increase <br />x) Demolition <br />a) Commercial/Residential Demolition up to 3,OOOSF <br />$287 <br />$296 <br />3.3% CPI increase <br />b) Each Additional 10,DODSF <br />$191 <br />$197 <br />3.3% CPI increase <br />C. Plan Checking Fee <br />Plan checking fee shall be paid at the time of application for a building permit. The plan checking fee is <br />in addition to the building permit fee and shall be as follows: <br />I) Plan Check Fee, if applicable <br />80% of building permit fee <br />ii) For Master Plans (i.e. identical buildings built by the same builder on the same lot or in the same Afull plan checking fee shall be paid for each Master Plan when <br />tract and for which building permits are issued at the same time) more than one building will be built and one-third (33%) of the full <br />plan checking fee shall be paid for each production phase building <br />at time of annlication. <br />iii) Changes, revisions, or additions to plans previously checked <br />$191 per hour; 1 hour minimum charge <br />$197 <br />3.3% CPI increase <br />iv) Additional plan review after the first re -check <br />$191 per hour; 1 hour minimum charge <br />$197 <br />3.3% CPI increase <br />v) Alternate Methods and Materials <br />$191 per hour; 1 hour minimum charge <br />$197 <br />3.3% CPI increase <br />vi) Energy Conservation -for all buildings and projects subject to the California Energy <br />Commission's conservation regulations <br />20% of building permit fee <br />D. Miscellaneous Fees <br />I) Miscellaneous Inspections <br />a) Fees for inspection not otherwise set forth herein <br />$191 per hour, 1 hour minimum charge <br />$197 <br />3.3% CPI increase <br />b) Fees for inspection conducted outside of normal business hours <br />$286 hourly rate; 2 hour minimum charge <br />$297 <br />3.3% CPI increase <br />ii) Investigation Fees <br />a) Investigation fee for work commenced without first obtaining permits as required by the San <br />Leandro Municipal Code, whether or not a permit is subsequently issued <br />b) Investigation fee for conditions that are not in compliance with the San Leandro Zoning <br />and/or Municipal Codes <br />$191 per hour; 1 hour minimum charge <br />$197 <br />3.3% CPI increase <br />Note: Payment of any investigation fees does not exempt any person from compliance with all <br />other provisions of applicable codes in the execution of the work nor from any other penalties <br />prescribed by law. <br />(1) <br />Note: For small tenant improvements to existing buildings and ADUs, the Chief Building Official and/or the Community Development Director may waive the Community Planning Fee at his/her <br />discretion. <br />(2) Community Planning Fee will not be charged for the following project types: permits for accessory dwelling units; stand-alone mechanical, plumbing, and electrical permits; minor residentialI NEW DESCRIPTION <br />remodels, and; minor tenant improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.