Laserfiche WebLink
BID SUMMARY <br />2019.0050 <br />19-20.005 <br />BID OPENING DeSilva Gates Construction LP A. Teichert & Son Inc. dba Teichert ConGranite Construction Company <br />DATE: Wednesday, May 20, 2020 11555 Dublin Boulevard 5200- Franklin Drive, Suite 115 715 Comstock Street <br />TIME: 3:30 PM Dublin, CA 94568 Pleasanton, CA 94588 Santa Clara, CA 95054 <br />LOCATION: City Clerk's Office Phone: (925) 829-9220 Phone: (925) 621-5700 Phone: (408) 327-7000 <br />Fax: (925) 803-4263 Fax: (925) 621-5799 Fax: (408) 327-7090 <br />ITEM <br />NO.ITEM <br />SPECIAL <br />PROVISIONS <br />SECTION UNIT COST ITEM COST UNIT COST UNIT COST UNIT COSTQUANTITYITEM COST ITEM COST <br />Annual Street Overlay/Rehabilitation 2018-20 <br />Prepared by: Claire O'Brien <br />Date Approved: 5/21/20 <br />PROJECT TITLE: <br />PROJECT NO.: <br />BID NO.: <br />ENGINEER'S ESTIMATE <br />ITEM COST <br />726 INSTALL SALVAGED SIGN ON NEW <br />POST AND FOUNDATION <br />315-1 15 EA $275.00 $4,125.00 $300.00 $4,500.00 $250.00 $3,750.00 $250.00 $3,750.00 <br />800 STORM WATER CURB INLET 303-1 4 EA $4,400.00 $17,600.00 $5,000.00 $20,000.00 $7,000.00 $28,000.00 $7,370.00 $29,480.00 <br />801 4" STORM DRAIN PIPE - PVC SDR <br />26 <br />306-15 83 LF $22.00 $1,826.00 $50.00 $4,150.00 $200.00 $16,600.00 $52.00 $4,316.00 <br />802 15" STORM DRAIN PIPE-CLASS IV <br />RCP <br />306-15 55 LF $187.00 $10,285.00 $400.00 $22,000.00 $300.00 $16,500.00 $679.00 $37,345.00 <br />803 6" STORM DRAIN CLEAN OUT 306-15 5 EA $550.00 $2,750.00 $1,000.00 $5,000.00 $750.00 $3,750.00 $1,335.00 $6,675.00 <br />805 TRASH CAPTURE DEVICE 304-6 6 EA $2,200.00 $13,200.00 $4,000.00 $24,000.00 $4,500.00 $27,000.00 $4,500.00 $27,000.00 <br />806 12" STORM DRAIN PIPE-CLASS IV <br />RCP <br />306-15 54 LF $165.00 $8,910.00 $200.00 $10,800.00 $250.00 $13,500.00 $439.00 $23,706.00 <br />807 CAST IRON PIPE CURB DRAIN 306-15 10 LF $165.00 $1,650.00 $150.00 $1,500.00 $250.00 $2,500.00 $165.00 $1,650.00 <br />808 TYPE A CONCRETE MANHOLE 303-1.1.4 4 EA $8,250.00 $33,000.00 $9,000.00 $36,000.00 $11,000.00 $44,000.00 $10,400.00 $41,600.00 <br />809 STORM WATER FIELD INLET 303-1.1.2 4 EA $6,600.00 $26,400.00 $4,000.00 $16,000.00 $5,000.00 $20,000.00 $4,520.00 $18,080.00 <br />810 6" PERFORATED STORM DRAIN <br />PIPE - PVC SDR 35 <br />306 13 LF $44.00 $572.00 $200.00 $2,600.00 $250.00 $3,250.00 $214.00 $2,782.00 <br />811 12" PVC C900 SDR 26, GREATER <br />THAN 12 FEET DEEP <br />500 30 LF $1,297.22 $38,916.75 $3,000.00 $90,000.00 $3,000.00 $90,000.00 $3,600.00 $108,000.00 <br />812 8" PVC C900 SDR 26, GREATER <br />THAN 12 FEET DEEP <br />500 20 LF $1,275.22 $25,504.50 $3,000.00 $60,000.00 $5,000.00 $100,000.00 $3,860.00 $77,200.00 <br />813 6" PVC C900 SDR 26, 7-8 FEET <br />DEEP SEWER LATERAL REPAIR <br />500 6 LF $826.45 $4,958.67 $1,000.00 $6,000.00 $3,000.00 $18,000.00 $2,500.00 $15,000.00 <br />814 SEWER LATERAL CONNECTION 500 3 EA $110.00 $330.00 $2,000.00 $6,000.00 $2,000.00 $6,000.00 $4,800.00 $14,400.00 <br />816 SS VIDEO CONFIRMATION 500 1 LS $11,000.00 $11,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $19,450.00 $19,450.00 <br />817 SHEETING, SHORING, AND <br />BRACING <br />306-4 1 LS $10,000.00 $10,000.00 $1,000.00 $1,000.00 $50,000.00 $50,000.00 $11,000.00 $11,000.00 <br />818 TYPE III INLET MODIFIED 303-1.1.3 1 EA $6,000.00 $6,000.00 $6,000.00 $6,000.00 $10,000.00 $10,000.00 $6,800.00 $6,800.00 <br />900 EARTHWORK AND TOPSOIL PART 8 1 LS $99.00 $99.00 $5,000.00 $5,000.00 $10,000.00 $10,000.00 $12,450.00 $12,450.00 <br />901 BIO-RETENTION EARTHWORK AND <br />TOPSOIL <br />PART 8 13 CY $33.00 $429.00 $200.00 $2,600.00 $500.00 $6,500.00 $286.00 $3,718.00 <br />902 CLASS II PERMEABLE MATERIAL PART 8 9 CY $220.00 $1,980.00 $200.00 $1,800.00 $200.00 $1,800.00 $143.00 $1,287.00 <br />903 SHRUBS AND GROUND COVER PART 8 1 LS $500.00 $500.00 $10,000.00 $10,000.00 $20,000.00 $20,000.00 $18,400.00 $18,400.00 <br />904 BIO-RETENTION SHRUBS AND <br />GROUND COVER <br />PART 8 1 LS $1,000.00 $1,000.00 $1,000.00 $1,000.00 $3,000.00 $3,000.00 $2,860.00 $2,860.00 <br />905 MULCH PART 8 14 CY $200.00 $2,800.00 $100.00 $1,400.00 $200.00 $2,800.00 $184.00 $2,576.00 <br />906 SOIL AMENDMENT PART 8 1 CY $500.00 $300.00 $300.00 $180.00 $550.00 $330.00 $510.00 $306.00 <br />907 IRRIGATION SYSTEM PART 8 1 LS $1,000.00 $1,000.00 $50,000.00 $50,000.00 $75,000.00 $75,000.00 $62,000.00 $62,000.00 <br />910 3” IRRIGATION SLEEVE PART 8 195 LF $10.00 $1,950.00 $100.00 $19,500.00 $150.00 $29,250.00 $122.00 $23,790.00 <br />911 LANDSCAPE MAINTENANCE <br />PERIOD <br />PART 8 1 LS $2,000.00 $2,000.00 $5,000.00 $5,000.00 $6,000.00 $6,000.00 $5,100.00 $5,100.00 <br />1001 REPLACE MONUMENT SIGN AND <br />PROVIDE NEW FOUNDATION <br />315-2 1 EA $1,000.00 $1,000.00 $1,000.00 $1,000.00 $10,000.00 $10,000.00 $3,000.00 $3,000.00 <br />Copy of Annual Street Overlay Rehab 2018-20 - Bid Summary Page 4 of 7 Printed 5/28/2020 @ 11:23 AM80