Laserfiche WebLink
14.11 Professional Seal. Where applicable in the determination of the contract administrator, <br />the first page of a technical report, first page of design specifications, and each page of <br />construction drawings shall be stamped/sealed and signed by the licensed professional <br />responsible for the reporUdesign preparation. The stamp/seal shall be in a block entitled <br />"Seal and Signature of Registered Professional with report/design responsibility," as in the <br />following example, <br />Seal and Signature of Registered Professional with <br />reportidesign responsibility. <br />Consulting Services Agreement between City of San Leandro and August 12, 2019 <br />Denalect for the Farrelly Pool Replacement Page 14 of 16 <br />