My WebLink
|
Help
|
About
|
Sign Out
Home
8B Consent 2020 0720
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0720
>
8B Consent 2020 0720
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 10:01:46 AM
Creation date
7/15/2020 12:35:27 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/20/2020
Retention
PERM
Document Relationships
Reso 2020-090 342 Marina Blvd Tract Map 8513
(Approved)
Path:
\City Clerk\City Council\Resolutions\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
to 01' Concurrent with the Building Permit. The San Leandro Municipal Code can be <br />601-ind at codc-,asp. <br />F. Site Lighting, and Photometric <br />1. A lighting plan and photometric study shall be developed and submitted for approval <br />along with the building permit application to assure sufficient illumination for the <br />safety and security of the future bUilding, Occupants. <br />G. Other <br />1. A Park Facilities Development Impact Fee shall he assessed Jor six (6) dwelling <br />units (du) as follows: <br />Park Land Acquisition Fee (Multi-Farally): $1 3,557.00/du or $81,342.00 <br />Park Improvement Fee (Multi-l.amily): $2.1 70.00/dLI or $13,020.00 <br />Credits <br />park I -and Acquisition f"'ee (Single-Farnilv): $15.511.00/du or $15,511.00 <br />Park Improvement Fee (Single -Family): $2,482.00/CILI Or $2,482.00 <br />Total Park Impact Fee (including <br />i, <br />credits $76,369.00 <br />These 1ecs above are Subject to change at. the start ofeach Fiscal year). <br />2. The Development f`ce I"or Street Improvement (t -)]-SI) shall be assessed in the arnount <br />of FW 7 '6_ jj:_ which is calculated at $ 1,389.42 per housing, unit.. This includes a credit <br />t'( -)r the siexisting ngI le-tamily residence in the amount of S 1,389.42. The Dl -Sl lee is <br />SUbject to change at the start of each fiscal year. <br />3. The Marina BOU $1 Traffic Impact. Fee shall beIlevard/Interstate 880 Interchange ' <br />assessed in the arriount of, ' $3,4944- -3]0 which is calculated at $698.86 per housing unit. Nj <br />This includes a credit for the existing single- farm I y residence in the amount of <br />698.86. This tee is subject to change at the start of each fiscal year. <br />4. The property is Outside the Marina Boulevard t )iderground Utility District. <br />Therefore, no Underground utility Fee is due for this project. <br />VI. ALAMEDA ('01INTY FIRE DEPARTMENT REQUIREMENTS <br />A. The Tract Map shall include Fire Department Access Hasenients. <br />13. Prior to issuance of budding peri -nit and fire clearance 6or occupancy, the following shall <br />be SLIN-nitted 16r Alameda ('ounty Fire Department review and approval: <br />1. The plans shall specify the installation ol'a NFPA 13D tire sprinklers. <br />2. Plans shall cornply to the Occupancy Type R-3 single-Jarnily residential. <br />3. The Plans shall detail and specify live (5) I`oot tire rated assembly along) the roof <br />installed on each side of the common "ails. <br />Agreement to Conditions 0clober 16, 2018 <br />zr <br />PLN 17-0049 11,ige 7 of I 1 <br />78
The URL can be used to link to this page
Your browser does not support the video tag.