My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2020-096 CSA Invengo Technology Corp for New RFID at Library
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2020
>
Reso 2020-096 CSA Invengo Technology Corp for New RFID at Library
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 10:04:10 AM
Creation date
7/27/2020 9:42:56 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/20/2020
Retention
PERM
Document Relationships
8H Consent 2020 0720
(Approved by)
Path:
\City Clerk\City Council\Agenda Packets\2020\Packet 2020 0720
Invengo Technology Corp_CSA_August 27, 2020.docx
(Approved by)
Path:
\City Clerk\City Council\Agreements\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*:1:1111r_1 <br />SCOPE OF SERVICES <br />RED Conversion Service <br />Invengo Technology Corp will completely project manage the outsourced staffing, equipment, <br />and supplies necessary to convert the San Leandro Public Library's existing collection at its 4 <br />(four) locations from EM security strips to RFID tags. The Invengo Technology Corp's Project <br />Manager will manage the conversion project. Invengo Technology Corp will provide the <br />following equipment and supplies: <br />RFID Tags <br />• 330,000 RFID Book Tags <br />• 57,000 RFID AV Tags <br />• 50 RFID "Other" Tags for equipment <br />Mobile Retrospective Encoders <br />• 4 (four) Mobile Retrospective Encoders rented during the 3-month conversion process. <br />Invengo Technology Corp will manage all aspects of the outsourced staffing for the RFID <br />conversion service, including hiring, training, scheduling (in coordination with Library staff), <br />supervising, and quality control of the work product. The San Leandro Public Library will <br />provide the Invengo Technology Corp's Project Manager with a pre -tagging checklist and an <br />item file to load onto the Mobile Retrospective Encoders ready for the conversion. The FE <br />Technolgies's RFID Conversion Project Manager will provide the San Leandro Public Library a <br />tagging and conversion plan covering the 4 (four) library facilities including the hours, days, and <br />dates when the conversation will occur at least 60 days prior to the start of the conversion <br />process. The conversion plan will include weekly quality control checks on the conversion work <br />product. The tagging and conversion process will require up to 90 days. <br />Hardware Specifications <br />The Invengo Technology Corp Installation Team (i.e., Technical Support Officers) is responsible <br />for installing and commissioning the RFID equipment on site. <br />Staff Workstations, "Circulation Assistants" <br />• All Circulation Assistants will be the "Shielded Standard Kit", a high-powered, shielded <br />device for multiple item processing in as small area at either Circulation/Service Desks or <br />at a Technical Services/Circulation Staff Workstation. <br />o Main Library <br />■ 2 (two) at the Main Library Circulation Desk <br />■ 6 (six) at the Main Library, various Technical Processing locations <br />o Manor Branch Library <br />Consulting Services Agreement between City of San Leandro and Last revised [6.11.2020] <br />Invengo Technology Corp for a Library RFID System Exhibit A — Page 1 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.