My WebLink
|
Help
|
About
|
Sign Out
Home
CSA Nichols Consulting Engineers 06172020
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2020
>
CSA Nichols Consulting Engineers 06172020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2025 7:34:28 PM
Creation date
7/29/2020 1:04:10 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/17/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B6332ADE-FC6B-4804-B30C-B48CD37F916F <br />EXHIBIT A <br />SCOPE OF SERVICES <br />PROJECT BACKGROUND <br />The City of San Leandro annually allocates funds toward street maintenance and rehabilitation. The total <br />budget for the Annual Street Overlay/Rehabilitation 2019-21 Project, including design, construction, <br />inspection, construction management, and contingency is $11,400,000. This project will involve extensive <br />paving work on street sections comprising of 2 arterial streets, 2 collector streets, and 10 residential streets. <br />Street sections included in the project are listed as follows: <br />Arterial and Collector Streets <br />Street Name <br />Start Location <br />End Location <br />Manor Boulevard <br />Kesterson St <br />Farnsworth Boulevard <br />Grand Avenue <br />Joaquin Avenue <br />Sybil Avenue <br />Hes erian Boulevard <br />Thornally Drive <br />CV Freeway <br />Bancroft Avenue <br />Lee Avenue <br />Sybil Avenue <br />Residential Streets <br />Street Name <br />Start Location <br />End Location <br />Corbet Court <br />Thornally Drive <br />North End Cul De Sac <br />Olive Court <br />Hes erian Boulevard <br />East End Cul De Sac <br />Norene Way <br />Benedict Drive <br />Sandelin Avenue <br />Fordham Avenue <br />Corvallis St <br />Rollins St <br />Rollins St <br />Ottawa Avenue <br />Fordham Avenue <br />Pleasant Way <br />Stoakes Avenue <br />Bellview Drive <br />Fleming St <br />Faro Avenue <br />Manor Boulevard <br />West Avenue 130th <br />Neptune Drive <br />Aurora Drive <br />Marina Court <br />West Avenue 130th <br />South End Cul De Sac <br />Thornally Drive <br />Hes erian Boulevard <br />Central Avenue <br />The streets were selected based on their Pavement Condition Index rating, and by visual inspection of road <br />surface deficiencies. <br />Along with pavement construction, the project will address ADA accessibility along the selected street <br />segments and new curb ramps and crossings shall be constructed where required. ADA compliant curb <br />ramps and street crossings shall be designed at all corners of a four-way intersection, and at two crossings <br />of a 'T" intersection. <br />This contract is for consulting services to develop Plans, Specifications, and Engineer's Estimate for the <br />Annual Street Overlay/Rehabilitation 2019-21 Project as described below. In addition, this CSA shall <br />Consulting Services Agreement between City of San Leandro and Nichols Consulting Engineers <br />for Annual Street Overlay/Rehabilitation 2019-21, Project No. 2020.0050 Exhibit A —Page 1 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.