My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2020 0903
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0908
>
8E Consent 2020 0903
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2020 7:10:40 PM
Creation date
9/2/2020 7:10:37 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/8/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 20-026 <br />$125,682. Because the work involves excavation it is possible that unforeseen conditions will be <br />uncovered, and these conditions may require a change in the contract scope. In order to avoid <br />delay and allow a timely response to change orders, Staff requests authority to issue construction <br />change orders up to 25% of the revised contract value. Authorizing 25% construction change <br />orders on the proposed increased contract value would equal a maximum contract value of <br />$156,598; or 90% above the original contract value. <br />Staff also recommends that $45,000 in funding be appropriated to the Heron Bay Levee <br />Maintenance Project from the Heron Bay Maintenance Assessment District fund balance to cover <br />the additional cost of this work and provide funding for the desired construction contingency at the <br />start of work. <br />Current Agency Policies <br />·Maintain and enhance San Leandro’s infrastructure. <br />Previous Actions <br />·On October 7, 2019, by Resolution No. 2019-168, City Council approved a contract with <br />Pacific Underground Services for $82,420 for the Heron Bay Levee Maintenance, Project <br />No. 2006.0111. <br />Committee Review and Actions <br />·On September 4, 2019 staff updated the City Council Facilities and Transportation <br />Committee on the project scope, cost and schedule. <br />Applicable General Plan Policies <br />·Policy OSC-1.2 Park Maintenance. Provide for the regular, systematic maintenance of <br />San Leandro’s parks and recreational facilities to prevent deterioration, ensure public <br />safety, and permit continued public use and enjoyment. <br />Permits and/or Variances Granted <br />Permits were obtained from the following agencies for this project: <br />·Army Corps of Engineers (including consultations with the National Fish and Wildlife <br />Service) <br />·Bay Conservation and Development Commission (BCDC) <br />·San Francisco Bay Regional Water Quality Control Board (RWQCB) <br /> <br />Environmental Review <br />This project was deemed Categorically Exempt per California Environmental Quality Act (CEQA) <br />section 15310 Class 1 (d) for existing structures. A CEQA Notice of Exemption was recorded on <br />June 12, 2015 with the Alameda County Recorder’s Office. <br />Page 3 City of San Leandro Printed on 9/2/2020 <br />2250
The URL can be used to link to this page
Your browser does not support the video tag.