Laserfiche WebLink
15. All proposed storm drain inlets and trench drains shall be marked "NO <br />DUMPING, DRAINS TO BAY" as per the City of San Leandro Standard Plan <br />Dwg. No. 204. All proposed storm drain inlets that are not within bioretention <br />areas shall have trash capture devices. This note shall be included on Building <br />Permit plan set. <br />16. Building Permit plans shall show that all abandoned driveways or damaged <br />curb, gutter and/or sidewalk shall be removed and replaced according to City <br />standard Plans Dwg. No. 100, 102 and 104. Plans shall show ADA path grades <br />and control point elevations across the proposed driveway on Manor Boulevard. <br />17. Sign installations must be per City of San Leandro Standard Plans Dwg. No. <br />136. <br />18. The City's traffic impact fee program is called "Development Fee for Street <br />Improvements" (DFSI). According to the adopted 2019-20 Fee Schedule, the <br />rate for "General Residential" land use is $1,449.91 per unit. Credit for existing <br />28,687 gross SF building for "Personal Service" land use category at the rate of <br />$2.41 will be assumed and as such no DFSI is due for this project. <br />19. The project is within the Marina Boulevard/Interstate 880 Interchange Traffic <br />Impact Fee Zone. According to the adopted 2019-20 Fee Schedule, the rate <br />for "General Residential" land use is $729.28 per unit. Credit for existing 28,687 <br />gross SF building for "Personal Service" land use category at the rate of $2.47 <br />will be assumed and as such no fee is due for this project. <br />20. A Park Facilities Development Impact Fee shall be assessed assuming 39 <br />dwelling units (du) will be added to the property as follows: <br />Park Land Acquisition Fee: <br />Park Improvement Fee: <br />Total Park Impact Fee: <br />$14,667.00/du or $572,013.00 <br />$2,348.00/du or $91,572.00 <br />$17,014.00/du or $663,546.00 <br />Please note that this is an estimated amount. These fees are subject to change <br />at the start of each fiscal year and will not be vested until issuance of building <br />permit. <br />21. Manor Boulevard is in the City's adopted Underground Utility District Master <br />Plan. As such, an in -lieu fee is required in the amount of $61,749.87 which is <br />calculated at $1,583.33 per residential unit. This fee is subject to change at the <br />beginning of each fiscal year and is not vested until Building Permit issuance. <br />VII. ALAMEDA COUNTY FIRE DEPARTMENT REQUIREMENTS <br />Please note that these conditions do not constitute a complete fire and building <br />code review. A formal plan check review will be completed at time of building permit <br />submittal. The buildings will need to comply with all building and fire code <br />requirements in affect at time of building permit submittal. <br />1. The R-3 Occupancies shall be provided with NFPA 13D fire sprinkler systems. <br />2. Hydrants shall be provided as recorded. <br />Recommended Conditions of Approval September 8, 2020 <br />PLN19-0037 903 Manor Blvd. Page 7 of 12 <br />