My WebLink
|
Help
|
About
|
Sign Out
Home
Controls Maint Agmt Stormwater Treatment 01102018
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2019
>
Controls Maint Agmt Stormwater Treatment 01102018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2024 4:12:10 PM
Creation date
9/22/2020 9:38:05 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/6/2019
Recorded Document Type
Stormwater Treatment
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANNUAL REPORT <br />Treatment Measure Operation and Maintenance <br />Inspection Report to the <br />City Engineer <br />City of San Leandro <br />835 East 14th Street <br />San Leandro, CA 94577 <br />This report and attached inspection checklists document the inspection and maintenance conducted for the <br />identified stormwater treatment measure(s) subject to the Maintenance Agreement between the City and the <br />property owner during the annual reporting period indicated below. <br />I. Property Information: <br />Property Address or APN: ---=20""'0""'0'""M=a=ri=na=-B="-'lv""d""-, =Sa=n"-"'L=e=a=n=d...,ro=._,C=A=-=-94~5'""7~7 _________ _ <br />Property Owner: ------~20~0~0~M~a~rm=· =a~L=L~C~·~a~D~e=l=aw~ar~e~L=i=m=i~te~d=L~i=ab=i=li~tv~C~o=m_,,.p~a=ny,__ ___ _ <br />II. Contact Information: <br />Name of person to contact regarding this report: __ -=T-=im=ur._T=ec ... i=m::.:e~r ______ _ <br />Phone number of contact person: (310) 354-2460 Email: ttecimer@omproperties.com <br />Address to which correspondence regarding this report should be directed: <br />19300 Hamilton Avenue Suite 200 <br />Gardena CA 90248 <br />Ill. Reporting Period: <br />This report, with the attached completed inspection checklists, documents the inspections and maintenance <br />of the identified treatment measures during the time period from January 1 to December 31 , ___ . <br />IV. Treatment Measure Information: <br />The following stormwater treatment measures (identified treatment measures) are located on the property <br />identified above and are subject to the Maintenance Agreement: <br />Identifying Type of Treatment Measure Location of Treatment Measure on the Property <br />Number of <br />Treatment <br />Measure <br />1 Bioretention area southwestern edge of the property <br />2 Bioretention area along southern property line, adjacent to southwest comer of <br />site <br />3 Bioretention area along southern property line, east ofbioretention area 2 <br />4 Bioretention area along the southern property line, east ofbioretention area 3 <br />5 Bioretention area southeast comer of site, on both east and west side of driveway <br />on Marina Boulevard, connected via equalizer pipe <br />10 <br />V:\2016\A16671\Documents\KW Reports and Calcs\SWQCP\O&M Agreement\2018·01-10 Main! Agr Legal Ann Rpt.doc
The URL can be used to link to this page
Your browser does not support the video tag.