Laserfiche WebLink
Flow-Through Planter Maintenance Plan for <br />Heritage Baptist Church <br />Project Address and Cross Streets Merced Street and Wicks Blvd. <br />Assessor's Parcel No.: _,0'"""7~7=B_,-0"""8'""'5-=5---=0'-'1=2---=0'-'1 _______ _ <br />Property Owner: Heritage Baptist Church Phone No.: 510-357-7023 <br />Designated Contact: Alan Fong Phone No.: 510-357-7023 Mailing <br />Address: 2960 Merced Street, San Leandro CA 94577 <br />The property contains 2 Flow-Through Planter(s), located as described below and as shown in <br />the attached site plan 1. 2 <br />• Flow-Through Planter No. 1 is located at Northwest corner of the newly proposed 7570 sf <br />building <br />• Flow-Through Planter No. 2 is located at West side of the newly proposed 7570 sf building <br />I. Routine Maintenance Activities <br />The principal maintenance objectives are to ensure that water flows unimpeded into <br />the flow-through planter and landscaping remains attractive in appearance. Table 1 <br />shows the <br />routine maintenance activities, and the frequency at which they will be conducted. <br />Table 1 <br />Routine Maintenance Activities for Flow-Through Planters <br />No. Maintenance Task Frequency of Task <br />1 Evaluate health of trees and groundcover. Remove and replace all dead and If wice a year <br />diseased vegetation. Treat vegetation using preventative and low-toxic methods. <br />2 Maintain vegetation and the irrigation system. Prune and weed to keep flow-iAs needed <br />hrough planter neat and orderly in appearance. <br />3 Check that mulch is at appropriate depth (3 inches per soil specifications) and Monthly <br />replenish as necessary. <br />4 Check that soil is at appropriate depth. Till or replace soil as necessary to Before wet season and as <br />maintain a minimum of 6 inches between top of mulch and overflow weir. necessary <br />5 Remove accumulated sediment, litter and debris from flow-through planter and Before wet season and as <br />dispose of properly. Confirm that no clogging will occur and that the box will drain necessary <br />within three to four hours. <br />6 Inspect flow-through planter to ensure that there are no clogs. Test with garden Monthly during the wet <br />hose to confirm that the planter will drain within three to four hours. season, and as needed after <br />storm events <br />7 Inspect downspouts from rooftops and sheet flow from paved areas to Monthly during the wet <br />ensure flow to planter box is unimpeded. Remove debris and repair season, and as needed after <br />damaged pipes. Check splash blocks or rocks and repair, replace and storm events <br />replenish as necessary. <br />8 Inspect overflow pipe to ensure that it will safely convey excess flows to storm Before the wet season, <br />drain. Repair or replace any damaged or disconnected piping. and as necessary <br />9 . Inspect flow-through planter to ensure that box is structurally sound (no cracks or I.Annually <br />leaks). Repair as necessary. <br />10 Inspect flow-through planter using the attached inspection checklist. Monthly, or after large <br />storm events, and after <br />removal of accumulated <br />2 Attached site plan must match the site plan exhibit to Maintenance Agreement.