My WebLink
|
Help
|
About
|
Sign Out
Home
Controls Maint Agmt Stormwater Treatment 09302019
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2020
>
Controls Maint Agmt Stormwater Treatment 09302019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2020 9:49:37 AM
Creation date
9/22/2020 9:39:05 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
1/31/2020
Recorded Document Type
Stormwater Treatment
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />Exhibit C: Landscape Based Maintenance Plan <br />Landscape Based Maintenance Plan <br />Routine Maintenance Activities <br />The maintenance objectives for the landscaped stormwater treatment include keeping up the pollutant <br />removal efficiency of the channel by maintaining a dense, healthy vegetated cover. Routine <br />maintenance activities, and the frequency at which they will be conducted, are shown in the table <br />below. <br />Routine Maintenance Activities for Landscape Based Treatment Areas <br />No. Maintenance Task <br />1 Remove obstructions, debris and trash from the treatment measure and <br />dispose of properly. <br />2 Inspect the treatment measure to ensure that it drains between storms and <br />within five days after rainfall. <br />3 Inspect downspouts, curb cuts, overtlow pipes, inflow pipes, outflow pipes, <br />and/or bubble ups to ensure flow to the treatment measure is unimpeded. <br />Remove debris and repair damaged pipes. Check splash blocks or rocks and <br />repair, replace and replenish as necessary. <br />4 Inspect inlets for channeling, ruts and holes, soil exposure or other evidence <br />of erosion. <br />5 Clear obstructions and remove sediment accumulating near inlets when it <br />builds up to 2 inches at any spot, or if it covers vegetation. Dispose of <br />sediment properly. <br />6 Inspect concrete lined measures to ensure that box is structurally sound (no <br />cracks or leaks). Repair as necessary. <br />7 Evaluate health of vegetation. Remove and replace all dead and diseased <br />vegetation. Replace with vegetation with similar growth requirements. List the <br />plants to be used in the treatment area here, or attach a separate sheet: <br />8 Maintain vegetation and the irrigation system. Irrigate vegetation when <br />necessary. Mow, prune and/or weed to keep the treatment measure neat and <br />orderly in appearance. Remove any invasive vegetation and/or weeds. Treat <br />vegetation using preventative and low-toxic methods (Integrated Pest <br />Management). <br />9 Check that mulch, cobble, and/or treatment soil 2 are at the appropriate depth/s <br />(per design specifications) and replenish when necessary. <br />10 Inspect the treatment measure using the inspection checklist provided in <br />Exhibit D. <br />Check the appropriate landscaped based measures that are located at this site: <br />)&.Bioretention Area <br />D Tree Well Filter <br />D Flow-Through Planter <br />D Vegetated Swale <br />Frequency of <br />Task <br />Minimum 3 <br />tlmes/year.1 <br />Minimum 3 <br />times/year.1 <br />Minimum 3 <br />times/year.1 <br />Minimum 3 <br />times/year.1 <br />Minimum 3 <br />times/year.1 <br />Annually <br />Monthly <br />Monthly <br />Minimum 3 <br />times/year.1 <br />Minimum 3 <br />times/year.1
The URL can be used to link to this page
Your browser does not support the video tag.