My WebLink
|
Help
|
About
|
Sign Out
Home
Controls Maint Agmt Stormwater Treatment 09302019
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2020
>
Controls Maint Agmt Stormwater Treatment 09302019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2020 9:49:37 AM
Creation date
9/22/2020 9:39:05 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
1/31/2020
Recorded Document Type
Stormwater Treatment
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
View images
View plain text
of San Leandro must be installed and maintained as indicated in this Agreement and as required by the <br />NPDES permit; and <br />WHEREAS, the City and the Property Owner agree that the health, safety and welfare of the <br />citizens of the City require that the stormwater treatment measure(s) and HM controls (if any) <br />detailed in the Site Plan or comparable document be constructed and maintained on the Property; and <br />WHEREAS, the City's Stormwater Management Ordinance, guidelines, criteria and other <br />written directions require that the stormwater treatment measure(s) and HM controls (if any), as <br />shown on the approved Site Plan or comparable document, be constructed and maintained by the <br />Property Owner. <br />THEREFORE, in consideration of the benefit received by the Property Owner as a result of <br />the City's approval of the Site Plan, the Property Owner hereby covenants and agrees with the City <br />as follows: <br />SECTION 1: CONSTRUCTION OF TREATMENT MEASURES AND HM CONTROLS <br />The on-site stormwater treatment measure(s) and HM controls (if any) shown on the Site <br />Plan or comparable document shall be constructed by the Property Owner in strict accordance with <br />the approved plans and specifications identified for the development and any other requirements <br />thereto which have been approved by the City in conformance with appropriate City ordinances, <br />guidelines, criteria and other written direction. <br />SECTION 2: OPERATION & MAINTENANCE RESPONSIBILITY <br />This Agreement shall serve as the signed statement by the Property Owner accepting <br />responsibility for operation and maintenance of stormwater treatment measures and HM controls <br />(if any) as set forth in this Agreement until the Property is legally transferred to another <br />entity. Before the Property is legally transferred to another entity, the Property Owner shall <br />provide to the City at least one of the following: <br />I) A signed statement from the public entity assuming post-construction responsibility for <br />treatment measure and HM controls maintenance and that the treatment measures and HM <br />controls (if any) meet all local agency design standards; or <br />2) Written conditions in the sales or lease agreement requiring the buyer or lessee to assume <br />responsibility for operation and maintenance (O&M) consistent with this provision, which <br />conditions, in the case of purchase and sale agreements, shall be written to survive beyond the <br />close of escrow; or <br />3) Written text in project conditions, covenants and restrictions (CCRs) for residential <br />properties assigning O&M responsibilities to the home owners association for O&M of the <br />treatment measures and HM controls (if any); or <br />4) Any other legally enforceable agreement or mechanism that assigns responsibility for the <br />maintenance of treatment measures and HM controls (if any). <br />SECTION 3: MAINTENANCE OF TREATMENT MEASURES AND HM CONTROLS <br />The Property Owner shall not destroy or remove the stormwater treatment measures and <br />HM controls (if any) from the Property nor modify the stormwater treatment system and HM <br />controls (if any) in a manner that lessens their effectiveness, and shall, at its sole expense, <br />adequately maintain the stormwater treatment measure(s) and HM controls (if any) in good <br />working order acceptable to the City and in accordance with the maintenance plan agreed hereto <br />and attached as Exhibit C. This includes all pipes, channels or other conveyances built to convey <br />stormwater to the treatment measure(s) and HM controls (if any), as well as all structures, <br />improvements, and vegetation provided to control the quantity and quality of the stormwater. <br />2 <br />C:\Users\saguirre\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\SOPTUOLX\O M Agreement for treat meas 11072019.doc
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).