My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt FBD Vanguard Construction, Inc. 08102020
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2020
>
Agmt FBD Vanguard Construction, Inc. 08102020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2020 1:03:47 PM
Creation date
9/22/2020 12:07:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
8/10/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: CDAEDABD-5ABE-4427-B13E-4AC4676B066B <br />CITY OF SAN LEANDRO <br />ST A TE OF CALIFORNIA <br />AGREEMENT <br />THIS AGREEMENT is made at San Leandro, California, as of Jf tJGUSI / lJ J .tb.f../) , by and <br />between FBD V Al'IGUARD CONSTRUCTION, INC. 550 Greenville Road, Livermore, CA 94550, <br />PHONE NO.: (925) 245-1300, hereinafter ca ll ed Contractor, and the CITY OF SAN LEANDRO, a <br />municipal corporation, hereinafter called City , who ag ree as follows: <br />Recitals <br />The City ha s awarded a contract to the Contractor for performing the work hereinafter mentioned in <br />accordance with the sealed proposal of sa id Conh·actor and of proceedings had a nd taken by the City <br />Co unci l of the City leading up thereto: <br />l . WORK TO BE DONE: The work to be done consists of demolition and replacement of <br />concrete curb ramps, sidewalk, curb & gutter; asphalt concrete tie-ins, and relocation of <br />pedestrian push buttons; and doing a ll appurtenant work in place and ready for use, all as shown in the <br />plans and described in the spec ifi ca tions entitled "Annual Street Scaling 2019-20 Project -Curb Ramp <br />Upgrade Phase", Project No. 2020.0070 now on file in the office of the Engineer of sa id City. <br />2. TIME OF PERFORMANCE: The work under this contract shall commence and be completed in <br />accordance with the times therefore prescribed in the specifications for said work. <br />3. PAYMENT: The City wi ll pay th e Contractor for the performance of said work the prices as stated <br />in the Contract Price Schedule, and at the times and in the manner prescribed in the specifications. <br />4. COMPONENT PARTS: This Agreement s ha ll consist of the following documents, each of which <br />is on file in the office of the Engineer of said City, and all of which are incorporated herein and made a <br />part h e reof by reference thereto: <br />A. This Agreement and Contract Price Schedule <br />B. Notice to Bidders <br />C . Proposa l Requirements <br />D. Resolution Approving Plans and Specifications and Callin g for Bids <br />E. Accepted Proposal <br />F. Special Provisions <br />G. Plans <br />H. Standard Specifications <br />I. Faithful Performance Bond <br />J. Payment Bond <br />K. Maintenance Bond <br />L. Project Addenda, if any <br />5. WAGE SCALE: Reference is h e reby made to the G eneral Wage Determination made by the <br />Director of Industrial Relations and adopted by Resolution No. 77-236 of the City Council. Reference <br />thereto is further m ade in the in struction s and information to bidders. The provisions of the General Wage <br />Determination made by the Director oflndustrial Relations and Resolution No. 77-236 are hereby specified <br />as the rate of prevailing wages to be paid workers on this project. For pmposes of Labor Code section <br />1781, this project is a "public work:" to which Labor Code section 1771 app li es, and the Contractor and all <br />li s ted or unlisted subcontractors mus t p erform th e work as a "publi c work." The Contractor has the <br />respons ibility for determining what is required to comply with its obligations und er Labor Code section <br />Last Revised: 06/01116 <br />2019-20 Sea l -Curb R am p Upgrade Phase <br />Page 1 Agreement <br />Proj ect No. 2020.0070
The URL can be used to link to this page
Your browser does not support the video tag.