My WebLink
|
Help
|
About
|
Sign Out
Home
NPSA Arborist Now 04232020
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2020
>
NPSA Arborist Now 04232020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2025 3:58:10 PM
Creation date
9/22/2020 12:39:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
4/3/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall complete correction thereof on the same calendar day, regardless of the size of the working force <br />required or the number of hours of work required. If the contractor cannot be reached by telephone or fails <br />to respond to the hazardous condition within the specified one (1) hour limit, the City shall have the <br />authority to cause said hazardous condition to be corrected and deduct the cost thereof from any amounts <br />due or to become due the Contractor. Such costs shall include any minimum or base costs for labor, <br />materials or equipment as required by contracts, agreements or supplier but in no case shall such cost be <br />less than $250 per hazardous condition per location. <br />13. LIQUIDATED DAMAGES: Failure to start and complete all work specified within the time allowed shall <br />constitute material breach of contract. The "time allowed" will be calculated from the date of the Purchase <br />Order issuance through the Project Delivery as indicated. Failure of Contractor to complete the work within <br />the time allowed will result in damages, and for each consecutive day in excess, the contractor shall pay to <br />the City the sum of $100.00 per calendar day. Such amount shall not be construed as a penalty but as a <br />minimum value of liquidated damages that may be deducted from payment due to the contractor if such <br />delay occurs. <br />Non-Professional Services Agreement between <br />City of San Leandro and Arborist Now, lnc;-Exhibit A <br />February 3, 2020 <br />Page 3of7
The URL can be used to link to this page
Your browser does not support the video tag.