My WebLink
|
Help
|
About
|
Sign Out
Home
PIA 2000 Marina LLC 07122018
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2018
>
PIA 2000 Marina LLC 07122018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2020 12:46:52 PM
Creation date
9/22/2020 12:41:57 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/12/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
·.; <br />CITY OF SAN LEANDRO <br />ST AND ARD PUBLIC IMPROVEMENT AGREEMENT <br />J lA v'( I Z.,~ it'>\~ <br />THIS AGREEMENT, entered into on , by and between the CITY OF SAN <br />LEANDRO, a municipal corporation of the State of California, hereinafter referred to as "City," and <br />2000 Marina LLC, hereinafter referred to as "Owner." <br />In consideration of the granting of certain entitlement of use described as follows: Issuan~e of <br />Encroachment Permit for the Public' Improvements associated with redevelopment of 2000 Marina <br />Boulevard, including roadway improvements on Marina Boulevard and undergrounding of utilities (see <br />Engineer's Estimate -Offsite Improvements by Kier & Wright Civil Engineers & Surveyors, Inc. dated <br />April 30, 2018), together with all required improvements to satisfy the Agreement to Conditions for Site <br />Plan Review PLNl 7-0005 at 2000 Marina Boulevard, San Leandro, California, Assessor's Parcel No. 077A- <br />0700-003-00, hereinafter referred to as "Project." <br />It is mutually agreed as follows: <br />AGREEMENTS <br />1. Performance of Work. Owner agrees to, furnish, construct, and install at his own expense all <br />public improvements shown on the plans prepared by Kier & Wright Civil Engineers & Surveyor, Inc., and <br />identified as Street Improvement Plans for 2000 Marina Boulevard by Kier & Wright Civil Engineers & <br />Surveyors, Inc. (total 9 sheets, dated 03/15/2018), Temporary Traffic Control at Site by CMC Traffic <br />Solutions (total 5 sheets, dated 02/06/2018) and Overhead Underground Utility Plans, by Pennino <br />Management Group (Sheets 1 through 18, dated o'4/16/2018), a copy of which is on file in the Office of the <br />City Engineer and is incorporated herein by reference and all other improvements required by the City <br />Engineer based upon the standards imposed by Title VII, Chapter 8 of the San Leandro Municipal Code and <br />the Standard Specifications adopted by the City of San Leandro for public works. Owner's costs shall <br />include all necessary relocation of existing utilities. <br />STANDARD PUBLIC IMPROVEMENT AGREEMENT Page 1of14
The URL can be used to link to this page
Your browser does not support the video tag.