My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2020 0928
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0928
>
5A Public Hearings 2020 0928
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 4:00:27 PM
Creation date
9/23/2020 12:20:20 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/28/2020
Retention
PERM
Document Relationships
Reso 2020-121 Climatec LLC Implementation and Construction Grand 59352113
(Approved)
Path:
\City Clerk\City Council\Resolutions\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 5 of 16 <br /> <br />5451 Chavenelle Road, Dubuque, Iowa 52002 ◼ [O] 563.585.0967 ◼ www.unisonsolutions.com <br />Design and content included in this document is proprietary and remains the property of Unison Solutions, Inc. <br />- Vessel equipped with a 30” side manway <br />- Internal supports and grating for media <br />- Pressure/Vacuum relief valve included <br />- Two top vents with stainless steel ball valves <br />- Bottom manual condensate drain with stainless steel ball valves <br />- 4” Inlet and outlet spool pipes and valves provided. <br /> <br />- Work Platform and Ladder <br /> <br />- Work platform shall be welded carbon steel construction with satin black <br />powder coat finish <br />- Ladder shall be aluminum construction <br /> <br />- Initial Charge of H2S Removal Media <br /> <br />- The initial charge of H2S Removal media for each Hydrogen Sulfide Removal <br />Media Vessel will be provided. <br />- H2S Removal to be loaded into Hydrogen Sulfide Removal Vessels by <br />INSTALLATION CONTRACTOR <br />- Initial charge of media consists of 8, 2,200-pound super sacks of media per <br />vessel for a total of 17,600 pounds of media <br /> <br />GAS COMPRESSION/MOISTURE REMOVAL SYSTEM <br /> <br />- Gas Compressor Inlet Moisture/Particulate Filter <br /> <br />- Mounted upstream of the Gas Compressor <br />- 99% removal of 3micron and larger particulates and liquid droplets <br />- Materials of construction shall be 304L stainless steel <br />- 150# ANSI B16.5 side inlet and outlet connections <br />- Cleanable polypropylene structured mesh element <br />- Differential pressure gauge across the filter element <br />- Sight glass for liquid level indication <br />- Level switches above the condensate drain to warn of failure <br />- Bottom drain with strainer, condensate pump, check valve, manual bypass and <br />piping <br /> <br />- Pre-cooler <br /> <br />- Within the heat exchanger the gas will be cooled to 50°F <br />- Gas to Glycol fin/tube core <br />- Materials of construction shall be aluminum fins on 304L stainless steel tubes <br />for the core, mounted in a 304L stainless steel housing <br />- 150# ANSI B16.5 inlet and outlet connections <br /> <br />- Gas Compressor <br /> <br />- One Oil Flooded Twin Screw Compressor <br />56
The URL can be used to link to this page
Your browser does not support the video tag.