My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2020 0928
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0928
>
5A Public Hearings 2020 0928
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 4:00:27 PM
Creation date
9/23/2020 12:20:20 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/28/2020
Retention
PERM
Document Relationships
Reso 2020-121 Climatec LLC Implementation and Construction Grand 59352113
(Approved)
Path:
\City Clerk\City Council\Resolutions\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 7 of 16 <br /> <br />5451 Chavenelle Road, Dubuque, Iowa 52002 ◼ [O] 563.585.0967 ◼ www.unisonsolutions.com <br />Design and content included in this document is proprietary and remains the property of Unison Solutions, Inc. <br />- Materials of construction shall be 304L stainless steel <br />- ANSI B16.5 inlet and outlet connections <br />- Centrifugal style with no element to be cleaned or changed <br />- Integral level switched for drain control <br />- Bottom drain with strainer, solenoid valve, check valve, manual bypass and <br />piping <br /> <br />- Gas Recirculation <br /> <br />- Backpressure regulator shall be provided to allow excess gas to flow from the <br />discharge of the system back to the inlet of the Gas Compressor. <br /> <br />- CO2 Removal System <br /> <br />- Two stage membrane CO2 Removal System <br />- Mounted downstream of the Siloxane/VOC Removal System <br />- Materials of construction shall be 304L stainless steel for filter housing and <br />cartridge style membrane element <br />- ASME Section VIII stamped membrane housings <br />- Manual isolation valves on all membranes <br />- Modulating valves for pressure control <br />- Reject Gas Line to the Flare with Actuated Valve (Flare supplied by others) <br />- Three Gas Analyzer (CO2, CH4, O2) <br />- Adjustable pressure reducing valve to flare <br /> <br />- Skid Base <br /> <br />- Welded carbon steel construction with satin black powder-coat finish <br />- All components mounted, piped and wired on skid base <br />- 24V and 120V electrical components wired to one of two junction boxes on <br />edge of skid <br />- INSTALLATION CONTRACTOR to provide conduit and wiring to 480V <br />components <br />- Conduit shall be rigid aluminum <br />- Condensate drains piped to edge of the skid base. Drains to be routed to floor <br />drain by INSTALLATION CONTRACTOR. <br /> <br />GLYCOL CHILLER <br /> <br />- Glycol Chiller (Remote Mounted) <br /> <br />- Sized for the process heat load <br />- Suitable for outdoor installation <br />- Refrigeration System <br />- One refrigeration circuit <br />- One compressor sized for 100% capacity <br />- Chiller capacity: 25% to 100% of rated capacity <br />- EC motor driven condenser fans <br />58
The URL can be used to link to this page
Your browser does not support the video tag.