My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2020 0928
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0928
>
8D Consent 2020 0928
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 3:58:50 PM
Creation date
9/23/2020 12:22:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/28/2020
Retention
PERM
Document Relationships
Reso 2020-123 Clean Air Grant Funding with BAAQMD Class IV Bike Lanes
(Approved)
Path:
\City Clerk\City Council\Resolutions\2020
Reso 2020-124 Reduction in Vehicle Travel Lanes and Bicycle Lane on Fairmont Drive
(Approved)
Path:
\City Clerk\City Council\Resolutions\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br />Page 15 <br /> <br /> <br />Fairmont Drive Class IV Bike Lane Installation Project November 2, 2018 <br />CONCLUSIONS AND RECOMMENDATIONS <br />Conclusions <br />Overall, the proposed road diet on Fairmont Drive from Hesperian Boulevard to East 14th <br />Street is expected to have some impact on the roadway operations. <br />Existing Year <br />For the Existing scenario with current signal timings, the study intersections all operate at <br />acceptable LOS E or better. The arterial currently operates at LOS F for all peak periods in the <br />westbound direction and during the PM peak hour in the eastbound direction. <br />With optimized signal timings, all the study intersections are expected to operate at <br />acceptable LOS. The study arterial is expected to operate at LOS F for all peak periods in the <br />westbound direction and during the Midday and PM peak hour in the eastbound direction. <br />Installation of the proposed project is not expected to cause intersection operations to <br />deteriorate below standard. However, assuming that study intersection cycle lengths will be <br />maintained and that the Fairmont corridor will not be coordinated, arterial operations are <br />expected to deteriorate below standard (to LOS F) in the eastbound direction during the AM <br />and Midday and periods. <br />In summary, the road diet is expected to have a significant impact on arterial operations in the <br />eastbound direction during the Midday and PM peak periods. Some increased queuing is <br />expected. <br />Cumulative Year <br />For the Cumulative scenario (no project), all the study intersections are expected to operate at <br />acceptable LOS. The corridor is expected to operate at acceptable LOS eastbound during the <br />AM peak period. However, the arterial is expected to operate at LOS F westbound during the <br />AM peak period and during the PM peak period in both directions. <br />Installation of the proposed project is not expected to cause intersection operations to <br />deteriorate below standard. Assuming that the Fairmont Drive corridor will not be coordinated, <br />the corridor is expected to deteriorate to LOS F in the eastbound direction during the AM peak <br />period. <br />In general, queuing is expected to increase due to the project. During the PM peak period the <br />eastbound queue is expected to spill back from Bayfair Drive past Hesperian Boulevard. <br />In summary, the project is expected to have a significant impact on arterial operations in the <br />eastbound direction during the AM peak period. It is also expected to result in increased <br />queuing. <br /> <br /> <br />178
The URL can be used to link to this page
Your browser does not support the video tag.