Laserfiche WebLink
13.2.3 City's Indemnity. During any period when the City or any Agent of the <br />City is installing, operating, or maintaining its Equipment, the City acknowledges and <br />agrees that the City has control of the License Area and will be solely responsible for any <br />resulting injury or damage to property or persons, except for injury or damage resulting <br />from Licensee's negligence, recklessness, or willful misconduct. Licensee is not a co - <br />employer of any employee of the City or any employee of the City's Agents, and Licensee <br />will not be liable for any Claim of any employee of the City or any employee of Licensor's <br />Agents, except for Claims arising from Licensee's negligence, recklessness, or willful <br />misconduct. The City agrees to Indemnify Licensee fully against any Claim brought by <br />any employee of the City or any employee of the City's Agents arising from or related to <br />the City's access to and use of the License Area and other activities of the City or its <br />Agents in or around the License Area, except for injury or damage resulting from <br />Licensee's negligence, recklessness, or willful misconduct. <br />13.3 Compliance with CPUC General Order 95. <br />Licensee shall conduct all activities on the License Area in accordance with CPUC <br />General Order 95 and the rules and other requirements enacted by the CPUC under that <br />General Order, as applicable and as amended. <br />13.4 Compliance with Electric Codes. <br />Licensee shall conduct all activities on the License Area in accordance with the <br />requirements of California Electric Code, National Electric Safety Code IEEE C2 ("NESC"), and <br />any applicable local electrical code, as any of those codes may be applicable or amended. To <br />the extent that CPUC General Order 95 does not address installation of cellular telephone <br />antennas on Poles carrying electrical lines, Licensee shall apply any applicable provisions of the <br />NESC, with particular attention to paragraphs 224, 235C, 235F, 238, 239, and 239H and <br />sections 22, 41, and 44. Where any conflict exists between the NESC, the California Electric <br />Code, any local code, and CPUC General Order 128, the more stringent requirements will apply, <br />as determined by the City. <br />13.5 Intentionally Omitted. <br />13.6 Regulatory Approvals. <br />Licensee represents and warrants that prior to, and as a condition of, conducting its <br />activities on the License Area, Licensee will acquire all Regulatory Approvals required for <br />Licensee's use of the License Area. Licensee shall maintain all Regulatory Approvals for <br />Licensee's Permitted Use on the License Area throughout the Term of this Master License and <br />for as long as any Equipment is installed on any portion of the License Area. Following <br />submission of a Pole License application by Licensee, such Regulatory Approvals (or written <br />denials explaining with specificity all reasons for such denials) shall be issued by the City within <br />the timeframe allowed by the FCC and 47 U.S.C. § 332(c)(7)(B)(i)(II). <br />13.7 Radiofrequency Emissions and Electromagnetic Fields. <br />Licensee's obligation to comply with all Laws includes all Laws relating to allowable <br />presence of or human exposure to Radiofrequency Radiation ("RFs") or Electromagnetic Fields <br />("EMFs") on or off the License Area, including all applicable FCC standards, whether such RF or <br />EMF presence or exposure results from Licensee's Equipment alone or from the cumulative <br />effect of Licensee's Equipment added to all other sources on or near the License Area. Licensee <br />must provide to the City a copy of the report required for Licensee's Encroachment Permit, of an <br />independent engineering consultant analyzing whether RF and EMF emissions at the proposed <br />Pole Locations would comply with FCC standards, taking into consideration the Equipment <br />installation specifications and distance to residential windows (each, an "Pre -Construction <br />Emissions Report"). If not provided earlier, Licensee must submit the Pre -Construction <br />24 <br />