My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2020-125 Verizon Wireless Master Agreement Small Cell Pole
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2020
>
Reso 2020-125 Verizon Wireless Master Agreement Small Cell Pole
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 3:56:54 PM
Creation date
10/8/2020 3:43:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
9/28/2020
Retention
PERM
Document Relationships
8E Consent 2020 0928
(Approved by)
Path:
\City Clerk\City Council\Agenda Packets\2020\Packet 2020 0928
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Except as specifically provided in Section 16.6 (Permitted Assignment), if Licensee <br />desires to enter into an Assignment of this Master License or any Pole License issued under this <br />Master License, Licensee shall give notice (a "Notice of Proposed Assignment") to the City, <br />stating in detail the terms and conditions for such proposed Assignment and financial information <br />reasonably sufficient to show that the proposed assignee (the "Assignee") has a demonstrated <br />ability to perform all of the obligations of Licensee under this Master License and any Pole <br />License issued hereunder. If Licensee does not deliver all information that the City reasonably <br />requires simultaneously with the Notice of Proposed Assignment, the date of Licensee's delivery <br />of notice will be deemed to have occurred only when it has delivered any additional information <br />the City requests. <br />16.3 City Response. <br />16.3.1 Timing. The City will grant or deny any request for consent to an <br />Assignment within 30 days after the City's receipt or deemed receipt, if delayed under <br />Section 16.2 (Notice of Proposed Assignment), of the Notice of Proposed Assignment <br />(the "Assignment Response Period"). If the City consents to the proposed Assignment, <br />then Licensee will have 180 days following the date the City delivers its consent notice to <br />Licensee to complete the Assignment. <br />16.3.2 Effect of Default. Licensee acknowledges that it would be reasonable for <br />the City to refuse to consent to an Assignment during any period during which any <br />monetary or other material event of default by Licensee is outstanding (or any event has <br />occurred that with notice or the passage of time or both would constitute a default) under <br />this Master License. <br />16.4 Effect of Assignment. <br />No Assignment by Licensee, consent to Assignment by the City, except a Permitted <br />Assignment under Section 16.6 (Permitted Assignment) will relieve Licensee of any obligation <br />on its part under this Master License. Any Assignment that is not in compliance with this Article <br />will be void and be a material default by Licensee under this Master License without a <br />requirement for notice and a right to cure. The City's acceptance of any License Fee, Additional <br />Fee, or other payments from a proposed Assignee will not be deemed to be the City's consent to <br />such Assignment, recognition of any Assignee, or waiver of any failure of Licensee or other <br />transferor to comply with this Article. <br />16.5 Assumption by Transferee. <br />Each Assignee shall assume all obligations of Licensee under this Master License and <br />each assigned Pole License and will be and remain liable jointly and severally with Licensee for <br />all obligations to be performed by Licensee. No Assignment will be binding on the City unless <br />Licensee or the Assignee delivers to the City evidence satisfactory to the City that the Assignee <br />has obtained all Regulatory Approvals required to operate as a wireless telecommunications <br />service provider on the assigned License Area, a copy of the assignment agreement (or other <br />document reasonably satisfactory to the City in the event of a Permitted Assignment under <br />Section 16.6 (Permitted Assignment)), and an instrument in recordable form that contains a <br />covenant of assumption by such Assignee satisfactory in substance and form to the City, <br />consistent with the requirements of this Article. However, the failure or refusal of an Assignee to <br />execute such instrument of assumption will not release such Assignee from its liability as set <br />forth in this Section. Except for a Permitted Assignment as provided in Section 16.6 (Permitted <br />Assignment), Licensee shall reimburse the City on demand for any reasonable costs that the City <br />incurs in connection with any proposed Assignment, including the costs of investigating the <br />acceptability of the proposed Assignee and legal costs incurred in connection with considering <br />any requested consent. <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.