My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2020-119 1388 Bancroft Apartments MND MMRP
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2020
>
Reso 2020-119 1388 Bancroft Apartments MND MMRP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 4:10:56 PM
Creation date
10/8/2020 3:46:36 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
9/21/2020
Retention
PERM
Document Relationships
5A Public Hearings 2020 0921
(Approved by)
Path:
\City Clerk\City Council\Agenda Packets\2020\Packet 2020 0921
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 PROJECT DESCRIPTION <br />foot decrease in impervious area, as the project would have 43,292 square feet of impervious <br />area, which would include 14,563 square feet of paved areas and 28,729 square feet of roof area. <br />The stormwater system would convey runoff from impervious surfaces to bioretention areas for <br />treatment of the water. The bioretention locations are shown on Figure 2.0-8, Stormwater Control <br />Plan. <br />LIGHTING <br />The project would include interior lighting for the residential uses, which would be typical of <br />residential -type lighting. The project would retain and not alter the existing street lighting on <br />Bancroft Avenue and on Joaquin Avenue. Parking lot lighting would comply with City of San <br />Leandro regulations and would be designed to minimize lighting and glare effects. <br />UTILITIES <br />The Pacific Gas and Electric Company (PG&E) would provide electric and natural gas services. <br />ACI would provide refuse collection services. The East Bay Municipal Utility District (EBMUD) would <br />supply water to the site. The City of San Leandro would provide wastewater collection, treatment, <br />and disposal services. The storm drain system connecting to the site would be maintained by the <br />San Leandro Public Works Department. Police services would be provided by the San Leandro <br />Police Department, and fire protection by the Alameda County Fire Department. <br />CONSTRUCTION <br />The developer plans to build the project in a single phase with a duration of approximately 15 <br />months. Consistent with the City's Noise Ordinance, construction would generally take place <br />between the hours of 7:00 a.m. and 7:00 p.m. Monday through Friday and between 8:00 a.m. and <br />7:00 p.m. on Saturdays and Sundays. <br />Construction activities would consist of demolishing the existing buildings, preparing the site <br />(including grading), removing existing paved areas, and constructing the new building and <br />parking lot. The top two feet of existing soil would be over -excavated and re -compacted. <br />Materials from the demolished buildings and paved areas would be used to fill in the existing <br />basement area of the current development. Construction would also involve the use of heavy <br />equipment such as bulldozers, scrapers, backhoes, excavators, loaders, compactors, rollers, and <br />a paving machine. <br />LAND USE <br />General Plan Designation <br />The project site is designated as Downtown Mixed Use in the San Leandro General Plan. The <br />designation corresponds to part of the area that has historically been San Leandro's central <br />business district. It allows a range of uses that together create a pedestrian -oriented street <br />environment. These uses include retail shops, services, offices, cultural activities, public and civic <br />buildings, and similar and compatible uses, including upper -story residential uses. A maximum floor <br />area ratio (FAR) of 3.5 applies, and residential densities range from 24 to 100 units per net acre. <br />The project would comply with applicable General Plan regulations. <br />1388 Bancroft Avenue Project City of San Leandro <br />Initial Study/Mitigated Negative Declaration November 2018 <br />2.0-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.