My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2020-119 1388 Bancroft Apartments MND MMRP
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2020
>
Reso 2020-119 1388 Bancroft Apartments MND MMRP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 4:10:56 PM
Creation date
10/8/2020 3:46:36 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
9/21/2020
Retention
PERM
Document Relationships
5A Public Hearings 2020 0921
(Approved by)
Path:
\City Clerk\City Council\Agenda Packets\2020\Packet 2020 0921
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 ENVIRONMENTAL CHECKLIST <br />runoff, and sedimentation (containment structures, overhead coverage, control devices). <br />With required implementation of these plans and BMPs, substantial erosion or the loss of <br />topsoil would not occur at the project site. Impacts would be less than significant. <br />c) Less Than Significant Impact with Mitigation Incorporated. As discussed above, the project <br />area is relatively flat, and landslides are not anticipated. Loose, unsaturated sandy soils <br />can settle during strong seismic shaking. Because the soils encountered at the project site <br />are predominantly stiff to very stiff clays and medium dense to dense sands, the potential <br />for differential seismic settlement is considered low (Cornerstone 2016). As described <br />above, the project applicant would be required to implement mitigation measure MM <br />GEO-1, which includes measures to reduce or avoid the potential for significant impacts <br />related to landslides, lateral spreading, subsidence, liquefaction, or collapse. Therefore, this <br />impact would be less than significant with mitigation incorporated. <br />d) Less Than Significant Impact. The geotechnical investigation encountered up to 2 feet of <br />undocumented fill underlain by alluvial deposits, consisting of medium stiff to very stiff clay <br />with varying percentages of sand and silt and above stiff silty and dense sand and gravels <br />(Cornerstone 2016). The fill consisted of clayey sand with gravel and well -graded sand. <br />Therefore, the project would not be located on expansive soil. The impact would be less <br />than significant. <br />e) No Impact. The project would connect to the City's sewage system and does not propose <br />the use or construction of septic tanks or alternative wastewater disposal systems. <br />Therefore, there would be no impact. <br />Mitigation Measures <br />MIA GEO-1 The project applicant shall implement all measures and recommendations set <br />forth in the geotechnical study prepared by Cornerstone Earth Group in May <br />2016. These include but are not limited to: <br />City of San Leandro <br />November 2018 <br />• Approximately 2 feet of undocumented clayey to well -graded sand fill was <br />encountered below the surface. This loose fill shall be overexcavated and <br />re -compacted within the proposed building footprint. Any undocumented <br />fills encountered during the demolition of the northern building basement <br />level shall also be re -compacted prior to the placement of new fill. <br />• A portion of the proposed building would straddle deeper fill that would be <br />required in order to fill the existing basement. Deeper fill transitions shall be <br />overexcavated at an inclination of 3:1 or flatter and rebuilt with engineered <br />fill to reduce the potential for differential movement beneath at -grade <br />structures. <br />• The corrosion potential for buried metallic structures, such as metal pipes, is <br />considered moderate. Metal pipes installed as part of the project shall have <br />special protection incorporated. <br />Timing/Implementation: During grading and construction <br />Enforcement/Monitoring: City of San Leandro Community <br />Development Department; and Engineering and Transportation <br />Department <br />1388 Bancroft Avenue Project <br />Initial Study/Mitigated Negative Declaration <br />3.0-33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.