Laserfiche WebLink
Description <br />Current Fee Reference <br />MProposed Fee Explanation <br />COMMUNITY DEVELOPMENT DEPARTMENT- Building Regulations Division (continued) <br />iv) Additional plan review after the first re -check <br />$197 per hour; 1 hour minimum charge <br />v) Alternate Methods and Materials <br />$197 per hour; 1 hour minimum charge <br />vi) Energy Conservation - for all buildings and projects subject to the California Energy Commission's <br />conservation regulations <br />20% of building permit fee <br />D. Miscellaneous Fees <br />i) Miscellaneous Inspections <br />a) Fees for inspection not otherwise set forth herein <br />$197 per hour; 1 hour minimum charge <br />b) Fees for inspection conducted outside of normal business hours <br />$297 hourly rate; 2 hour minimum charge <br />ii) Investigation Fees <br />a) Investigation fee for work commenced without first obtaining permits as required by the San Leandro <br />Municipal Code, whether or not a permit is subsequently issued <br />b) Investigation fee for conditions that are not in compliance with the San Leandro Zoning and/or <br />Municipal Codes <br />$197 per hour; 1 hour minimum charge <br />Note: Payment of any investigation fees does not exempt any person from compliance with all other <br />provisions of applicable codes in the execution of the work nor from any other penalties prescribed by <br />law. <br />(1) <br />Note: For small tenant improvements to existing buildings and ADUs, the Chief Building Official and/or the Community Development Director may waive the Community Planning Fee at his/her discretion. <br />(2) Community Planning Fee will not be charged for the following project types: permits for accessory dwelling units; stand-alone mechanical, plumbing, and electrical permits; minor residential remodels, and; minor tenant improvements. <br />E. Other Fees and Charges <br />(i) Technology Fee <br />6% of permit fee, minimum $6.87 per permit type <br />(ii) Community Planning Fee (for commercial, industrial & residential projects) <br />0.3%of total valuation of construction <br />(iii) Strong Motion Impact Fee: State mandated tax for the Seismic Safety Commission for seismic monitoring. <br />-- Residential <br />0.00013 per $1.00 Valuation or fraction thereof with a $0.50 min. <br />-- Commercial/Industrial <br />0.00028 per $1.00 Valuation or fraction thereof with a $.50 min. <br />(iv) Building Standards Commission (SB1473) Fee: State Mandated tax for Green Building Standards collected <br />for the State by the City. <br />All Residential, Commercial, and Industrial permits that use Valuation to determine permit fees: $1.00 per <br />$25,000 valuation or fraction thereof with a $1.00 minium. <br />(v) Exception to Noise Ordinance <br />$463 <br />(vi) Certificate of Occupancy <br />$197 per hour; 1 hour minimum charge <br />(vii) Temporary Certificate of Occupancy per 30 days <br />$197 per hour; 1 hour minimum charge <br />(viii) Certificate of Compliance: <br />$197 per hour; 1 hour minimum charge <br />(ix) House Moving Permit <br />$197 per hour; 1 hour minimum charge <br />(x) Microfilm Copies <br />$1.20 <br />(xi) Photocopies <br />$0.10 per page <br />(xii) Microfilming of Permit and Plans includes imaging fee for fire permits: (For purposes of fee charges, each <br />permit is considered a drawing) <br />-- 8-1/2 x 11 or 11 x 14 drawings including fire permits <br />$1.90 per sheet <br />-- All other size drawings <br />$2.10 per sheet <br />(xiii) Appeals <br />Direct Costs (1) <br />M <br />Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />(2) Community Planning Fee will not be charged for the following project types: permits for accessory dwelling units; stand-alone mechanical, plumbing, and electrical permits; minor residential remodels, and; minor tenant improvements. <br />3 <br />Administrative Citations <br />New Section <br />Building Code Violation <br />- 1st Violation <br />$130 <br />Govt. Code <br />- 2nd Violation <br />$700 <br />Govt. Code <br />- 3rd Violation <br />$1,300 <br />Go. Code <br />Each additional violation of the same ordinance within two years of the first violation <br />$2,500 <br />Govt. Code <br />