My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2020 1116
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 1116
>
8G Consent 2020 1116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2020 6:58:34 PM
Creation date
11/11/2020 6:58:26 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
11/16/2020
Retention
PERM
Document Relationships
Reso 2020-144 CSA Griffin Structures for Shoreline Park
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and <br />Griffin Structures, Inc for Staff Augmentation Page 14 of 16 <br /> 10.10 Notices. <br /> <br />Any written notice to Consultant shall be sent to: <br />Jon Hughes <br />1850 Warburton Ave, Suite 120 <br />Santa Clara, CA 95050 <br />408-955-0431 <br />jhughes@griffinstructures.com <br /> <br />Any written notice to City shall be sent to: <br />Nick Thom, PE, City Engineer <br />835 East 14th Street <br />San Leandro, CA 94577 <br />510-577-3431 <br />nthom@sanleandro.org <br /> <br />With a copy to: <br />City of San Leandro <br />Department of Finance <br />c/o Purchasing Agent <br />835 East 14th Street <br />San Leandro, CA 94577 <br /> <br /> 10.11 Professional Seal. Where applicable in the determination of the contract administrator, <br />the first page of a technical report, first page of design specifications, and each page of <br />construction drawings shall be stamped/sealed and signed by the licensed professional <br />responsible for the report/design preparation. The stamp/seal shall be in a block entitled <br />"Seal and Signature of Registered Professional with report/design responsibility," as in the <br />following example. <br /> <br /> <br />_________________________________________ <br />Seal and Signature of Registered Professional with <br />report/design responsibility. <br /> <br /> <br />10.12 Integration. This Agreement, including the scope of work attached hereto and <br />incorporated herein as Exhibits A, B, C, D, and E represents the entire and integrated agreement <br />between City and Consultant and supersedes all prior negotiations, representations, or <br />agreements, either written or oral. <br /> <br />Exhibit A Scope of Services <br />Exhibit B Compensation Schedule & Reimbursable Expenses
The URL can be used to link to this page
Your browser does not support the video tag.