Laserfiche WebLink
<br /> <br /> <br /> <br />Page 14 <br /> <br /> <br />Complete Streets Evaluation – Hesperian Blvd November 9, 2018 <br />or could be implemented along the northern part of the study corridor in combination with lane <br />management on the southern part of the study corridor. <br />Removal of the center curb median would be the most costly solution, requiring curb median <br />demolition, paving, and restriping, as well as some potential traffic signal modifications, due to <br />realignment of traffic lanes. However, this modification would allow the project to be <br />implemented without loss of travel lanes, resulting in a less-than-significant impact. <br />487