Laserfiche WebLink
BAY FAIR TOD SPECIFIC PLAN <br />Infrastructure Capital Improvements <br />This section consolidates the list of capital improvements from other chapters of the Specific Plan. It <br />describes improvements by topic, (e.g. transportation, stormwater system, water system, reclaimed <br />water system, and sanitary sewer) and provides details on the cost, benefit allocation, and timing for <br />each project. Specific funding mechanisms for these projects are described in the Funding Strategy <br />Section beginning on page 132. <br />Figures 7.1, 7.2, and 7.3 show concepts for how water, stormwater, and wastewater infrastructure <br />can be integrated into the future street grid as it is created, although the final location of this <br />infrastructure is dependent on physical constraints, development phasing, and other design details. <br />Water System Improvement Projects <br />There is limited existing water infrastructure <br />within the Plan Area; however, there are <br />large transmission mains ranging in size from <br />12-inches to 36-inches that surround and <br />bisect it. All new water supply infrastructure <br />that will serve the Plan Area is assumed to <br />be 12-inches. Figure 7.1 shows the proposed <br />location of this infrastructure, in addition to <br />the existing transmission mains. <br />The planning level cost of these studies and the <br />shared backbone infrastructure is provided in <br />Table 7.2. <br />Service for the Hesperian Boulevard corridor <br />are intended to be designed and constructed <br />with development so no costs are provided for <br />these areas. <br />Table 7.2 Water System Improvement Projects <br />EST. PROJECT <br />ESTIMATED <br />PROJECT <br />DESCRIPTION <br />TOTAL COST <br />PROJECT <br />(IN 2017 $) <br />TIMING <br />Review Urban Water Management Plan to verify that the <br />Urban Water <br />Bay Fair Specific Plan conforms to all constraints and <br />$15,000 <br />Immediate <br />Management Plan <br />policies. <br />Prepare Water Supply Study to identify pressures, pipe <br />sizes and locations of backbone infrastructure to support <br />Water Supply Study <br />peak hour and fire flow demands. The study should detail <br />$25,000 <br />Medium <br />infrastructure improvements and provide phasing and <br />buildout guidance related to the Specific Plan. <br />Construct Water Supply Backbone infrastructure before <br />Water Supply Backbone <br />or during future street and right-of-way construction in <br />$7,500,000 <br />Ongoing <br />coordination with future development, as shown in Figure <br />7.1. <br />Total Potential Water System Improvements <br />$7,580,000 <br />122 <br />