My WebLink
|
Help
|
About
|
Sign Out
Home
4B Presentations 2021 0301
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0301
>
4B Presentations 2021 0301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 9:06:09 PM
Creation date
2/24/2021 9:05:05 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/1/2021
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Install adaptive traffic signals on San Leandro Blvd from Davis St to East 14th Street and on Washington Ave from <br />Williams St to the Southern City Limit. <br />Description <br />Install adaptive traffic signals on San Leandro Blvd from Davis St to East 14th Street and on Washington Ave from <br />Williams St to the Southern City Limit. <br />Justification or Benefit of Project <br />Project will improve traffic flow, efficiency, and reduce greenhouse gases. <br />Consequences of not doing the Project <br />Without this project, congestion and greenhouse gases will increase. <br />Project Numb 2022.5680Project Typ Traffic and Pedestrian - Contr <br />Status Active <br />Department/Sponsor Engineering & Transportatio <br />Impact to Operation Cost Impact to Maintenance Cost Increase <br />Likely Cost $800k to $1.6M <br />Categor Roadways for vehicles <br />Possible Funding Sources General Fund, DFSI, grants (BAAQMD) <br />Detailed Cost <br />Council District <br />Project Name Adaptive signals SLB and Washington
The URL can be used to link to this page
Your browser does not support the video tag.