My WebLink
|
Help
|
About
|
Sign Out
Home
4B Presentations 2021 0301
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0301
>
4B Presentations 2021 0301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 9:06:09 PM
Creation date
2/24/2021 9:05:05 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/1/2021
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Summary <br />Funding for repair and improvements to Casa Peralta described in the conceptual plans prepared by Architectural <br />Resource Group in 2016. <br />Description <br />Funding for repair and improvements to Casa Peralta described in the conceptual plans prepared by Architectural <br />Resource Group (ARG) in 2016. $2M has been allocated for phase 1 improvements, the cost listed is for the <br />unfunded short and medium term improvements described by ARG. <br />Justification or Benefit of Project <br />The hand painted ceramic tile is a popular feature of the site that is an essential part of the character of the grounds. <br />This tile is deteriorating each year. It more economical to stop the deterioration now, before more extensive work is <br />required. <br />Consequences of not doing the Project <br />Without additional funds, only a small portion of the outstanding work will be accomplished. <br />Project Numb 2022.2440Project Typ Libraries and Casa Peralta <br />Status Active <br />Department/Sponsor Library Services <br />Impact to Operation Cost Increase Impact to Maintenance Cost Neutral <br />Likely Cost <br />Categor Buildings <br />Possible Funding Sources <br />Detailed Cost $6,000,000 <br />Council District 1 <br />Project Name Casa Peralta Improvements Phase 2
The URL can be used to link to this page
Your browser does not support the video tag.