Laserfiche WebLink
Summary <br />Replace restrooms at Cherry Grove Park. <br />Description <br />Demolish and replace existing restroom with pre-fab restroom with higher capacity and drinking fountain attached to <br />the front of the building. Connect toilets and hose to well water source. Stainless steel fixtures and conduit and <br />anchoring point for potential future security camera. Provide additional storage area for Park Ranger supplies. Also <br />include auto-locking doors with timers and a deadbolt so we have both options auto/manual lock up at night. Include <br />cinderblock walls and partitions (same design as Toyon Park except do not have exposed wood on the ceilings). <br />Include LED outside lights to illuminate the outer walls as was done at Toyon. Have outer door locking system like <br />we have at Marina Park south end where staff can lock themselves in while cleaning. It is very difficult for staff to <br />clean the r/r without people pushing their way in. <br />Justification or Benefit of Project <br />Increased capacity for the public, save water and provide the Park Rangers with a storage area. <br />Consequences of not doing the Project <br />Existing building cannot handle the current heavy recreational use and needs a new roof. Existing building uses a lot <br />of water compared to switching the supply to well water (which exists for the park). Not adequate storage for the <br />rangers. <br />Project Numb 2009.0410Project Typ Parks and Open Space <br />Status Active <br />Department/Sponsor Public Works <br />Impact to Operation Cost Decrease Impact to Maintenance Cost Decrease <br />Likely Cost <br />Categor Parks and Open Space <br />Possible Funding Sources General Fund <br />Detailed Cost $427,963 <br />Council District <br />Project Name Cherry Grove Restroom Replacement