Laserfiche WebLink
Unfunded CIP ProjectsProject Number Group Project NameDetailed Est(if done) Likely Project Cost(if no detailed est) Weighted Score2020.4220Bicycle and Pedestrian Bancroft and Williams Bicycle Corridors 7,500,000$                   1202016.0490 Bicycle and Pedestrian Manor Blvd Pedestrian Improvements 3,856,410$                   1152022.4840Bicycle and Pedestrian Bayfair TOD Intersection Improvements 3,250,000$                   1102022.4460Bicycle and Pedestrian Downtown Plaza Maintenance 450,000$                      1002020.4240Bicycle and Pedestrian School Route Ped Safety Improvements 6,855,840$                   1002018.5400 Bicycle and Pedestrian Downtown Pedestrian Lighting 6,213,105$                   1002012.0120 Bicycle and Pedestrian E14th Ped Imp Design 136th‐S City Limit 564,536$                      1002018.4800 Bicycle and Pedestrian Williams St Bike and Ped Imp near UPRR 1,836,037$                   952018.4490 Bicycle and Pedestrian Downtown Pedestrian Improvements‐$                                   $1.6M to $3.2M 952022.5610Bicycle and Pedestrian Pedestrian Crossing Improvements 250,000$                      902005.0100 Bicycle and Pedestrian E14th St Medians ‐ 145th to S City Limit 4,423,701$                   902022.4200Bicycle and Pedestrian Lewelling Blvd Class IV bike lanes ‐$                                   $1.6M to $3.2M 852016.0441 Bicycle and Pedestrian West Industrial Area Ped Lighting Instal ‐$                                   $1.6M to $3.2M 852016.0440 Bicycle and Pedestrian West Industrial Area Ped Lighting Study 83,138$                        852018.5440 Bicycle and Pedestrian Alvarado Street Pedestrian Lighting 872,117$                      802016.0420 Bicycle and Pedestrian Bike and Ped Improve BART to Bayfair ‐$                                  $800k to $1.6M 802018.5670 Bicycle and Pedestrian East 14th / Juana Pedestrian Safety 654,088$                      752012.0132 Bicycle and Pedestrian Marina Blvd Streetscape Merced‐Doolittle ‐$                                   $3.2M to $6.4M 752012.0131 Bicycle and Pedestrian Marina Blvd Streetscape West of Doolittl ‐$                                   $3.2M to $6.4M 752018.4200 Bicycle and Pedestrian Davis St Bike Lanes Orchard to SLB ‐$                                  $400k to $800k 702016.0340 Bicycle and Pedestrian Merced St Ped Imp Williams to Wicks ‐$                                   $1.6M to $3.2M 702022.4820Bicycle and Pedestrian Bancroft Ave Widen Sidewalk ‐$                                  $100k to $200k 602018.4450 Bicycle and Pedestrian Victoria Circle Reconfiguration ‐$                                  $200k to $400k 552016.0520 Bicycle and Pedestrian Floresta Monterey Pedestrian Imp286,881$                      552020.8000Bicycle and Pedestrian Public Bike Lockers ‐$                                   <$100k 502022.4800Bicycle and Pedestrian Sidewalk Estudillo and Lake Chabot Road ‐$                                  $200k to $400k 452018.4220 Bicycle and Pedestrian Downtown Wayfinding Signage ‐$                                   <$100k 45