My WebLink
|
Help
|
About
|
Sign Out
Home
4B Presentations 2021 0301
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0301
>
4B Presentations 2021 0301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 9:06:09 PM
Creation date
2/24/2021 9:05:05 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/1/2021
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Unfunded CIP ProjectsProject Number Group Project NameDetailed Est(if done) Likely Project Cost(if no detailed est) Weighted Score2020.4220Bicycle and Pedestrian Bancroft and Williams Bicycle Corridors 7,500,000$ 1202016.0490 Bicycle and Pedestrian Manor Blvd Pedestrian Improvements 3,856,410$ 1152022.4840Bicycle and Pedestrian Bayfair TOD Intersection Improvements 3,250,000$ 1102022.4460Bicycle and Pedestrian Downtown Plaza Maintenance 450,000$ 1002020.4240Bicycle and Pedestrian School Route Ped Safety Improvements 6,855,840$ 1002018.5400 Bicycle and Pedestrian Downtown Pedestrian Lighting 6,213,105$ 1002012.0120 Bicycle and Pedestrian E14th Ped Imp Design 136th‐S City Limit 564,536$ 1002018.4800 Bicycle and Pedestrian Williams St Bike and Ped Imp near UPRR 1,836,037$ 952018.4490 Bicycle and Pedestrian Downtown Pedestrian Improvements‐$ $1.6M to $3.2M 952022.5610Bicycle and Pedestrian Pedestrian Crossing Improvements 250,000$ 902005.0100 Bicycle and Pedestrian E14th St Medians ‐ 145th to S City Limit 4,423,701$ 902022.4200Bicycle and Pedestrian Lewelling Blvd Class IV bike lanes ‐$ $1.6M to $3.2M 852016.0441 Bicycle and Pedestrian West Industrial Area Ped Lighting Instal ‐$ $1.6M to $3.2M 852016.0440 Bicycle and Pedestrian West Industrial Area Ped Lighting Study 83,138$ 852018.5440 Bicycle and Pedestrian Alvarado Street Pedestrian Lighting 872,117$ 802016.0420 Bicycle and Pedestrian Bike and Ped Improve BART to Bayfair ‐$ $800k to $1.6M 802018.5670 Bicycle and Pedestrian East 14th / Juana Pedestrian Safety 654,088$ 752012.0132 Bicycle and Pedestrian Marina Blvd Streetscape Merced‐Doolittle ‐$ $3.2M to $6.4M 752012.0131 Bicycle and Pedestrian Marina Blvd Streetscape West of Doolittl ‐$ $3.2M to $6.4M 752018.4200 Bicycle and Pedestrian Davis St Bike Lanes Orchard to SLB ‐$ $400k to $800k 702016.0340 Bicycle and Pedestrian Merced St Ped Imp Williams to Wicks ‐$ $1.6M to $3.2M 702022.4820Bicycle and Pedestrian Bancroft Ave Widen Sidewalk ‐$ $100k to $200k 602018.4450 Bicycle and Pedestrian Victoria Circle Reconfiguration ‐$ $200k to $400k 552016.0520 Bicycle and Pedestrian Floresta Monterey Pedestrian Imp286,881$ 552020.8000Bicycle and Pedestrian Public Bike Lockers ‐$ <$100k 502022.4800Bicycle and Pedestrian Sidewalk Estudillo and Lake Chabot Road ‐$ $200k to $400k 452018.4220 Bicycle and Pedestrian Downtown Wayfinding Signage ‐$ <$100k 45
The URL can be used to link to this page
Your browser does not support the video tag.