Laserfiche WebLink
BID SUMMARY <br /> <br />BID OPENING <br />DATE: January 28, 2021 Date Approved:12/21/2020 <br />TIME: 3:00 pm Prepared by:J. O'Driscoll <br />LOCATION: City Clerk's Office <br />ITEM <br />NO.ITEM UNIT COST ITEM COST <br />ENGINEER'S ESTIMATE <br />PROJECT TITLE: <br />PROJECT NO.: <br />BID NO.: <br />QUANTITY <br />Sanitary Sewer Point Repair 2021 <br />2020.0120 <br />20-21.005 <br />37 Landscape Removal and <br />Restoration, per sections 306- <br />13.8 <br />771 SF <br />$35.00 <br />$26,985.00 <br />38 Rehabilitate 6-inch Host Pipeline <br />with Cured-in-Place Pipeline, per <br />section 500-1.4 <br />2,907 LF <br />$45.00 <br />$130,815.00 <br />39 Rehabilitate 8-inch Host Pipeline <br />with Cured-in-Place Pipeline, per <br />section 500-1.4 <br />380 LF <br />$50.00 <br />$19,000.00 <br />40 Re-establish Service Lateral <br />Connections in CIPP <br />Rehabilitated Pipelines, per <br />Section 500-1.4.7 <br />113 EA <br />$700.00 <br />$79,100.00 <br />41 Replace and upsize 361 LF of 8- <br />inch Pipeline with New to 10-inch <br />pipeline by open trench Method, <br />including trench excavation, <br />backfill and surface restoration, <br />per Section 306-7 <br />1 LS <br />$245,000.00 <br />$245,000.00 <br />42 Work Site Safety, per Section 7- <br />10.4.1 <br />1 LS $25,000.00 $25,000.00 <br />0 UNIT $0.00 <br />TOTAL BASE BID: <br />REQUIRED DOCUMENTATION: <br />Agreement to be Bound <br />$2,326,942.00 <br />Bid Bond <br />San Leandro Local Business <br />Addendum #1 - 2 <br />25 % Participation <br />Good Faith Effort <br /> <br />Cratus, Inc.Kerex Engineering, Inc.KJ Woods Construction, Inc. <br />2178 Palou Avenue 4941 Pacheco Boulevard PO Box 947 <br />San Francisco, CA 94124 Martinez, CA 94553 So. San Francisco, CA 94083 <br />Phone: (415) 939-2840 Phone: (925) 387-8913 Phone: (415) 759-0506 <br />Fax: (415) 520-6037 Fax: (925) 387-0853 Fax: (415) 468-1359 <br />UNIT COST UNIT COST UNIT COST ITEM COSTITEM COST ITEM COST <br />This document is a summary of bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is not a finding that <br />such bid has been found to be responsive or accepted as complete by the <br />City. An award of contract, if any, is subject to approval of the City Council <br />and/or the City Manager. Contractors should refer to the contract documents <br />for bidding information. <br />$5.00 $3,855.00 $10.00 $7,710.00 $10.00 $7,710.00 <br />$45.00 $130,815.00 $40.00 $116,280.00 $40.00 $116,280.00 <br />$50.00 $19,000.00 $40.00 $15,200.00 $45.00 $17,100.00 <br />$50.00 $5,650.00 $100.00 $11,300.00 $125.00 $14,125.00 <br />$80,000.00 $80,000.00 $290,000.00 $290,000.00 $180,500.00 $180,500.00 <br />$8,000.00 $8,000.00 $5,000.00 $5,000.00 $23,319.00 $23,319.00 <br />$0.00 $0.00 $0.00 <br />$2,988,665.00$2,582,048.00 <br />YESn/a <br />YES <br />YES YES <br />NO <br />YESYES <br />$3,488,000.00 <br />YES <br />YES <br />NO <br />YES <br />NO NO <br />Pending NO <br />YES YES <br />Bid Summary SS Point Repairs 2021.xlsx Page 7 of 12 Printed 2/2/2021 @ 2:21 PM