BID SUMMARY
<br />
<br />BID OPENING
<br />DATE: January 28, 2021 Date Approved:12/21/2020
<br />TIME: 3:00 pm Prepared by:J. O'Driscoll
<br />LOCATION: City Clerk's Office
<br />ITEM
<br />NO.ITEM UNIT COST ITEM COST
<br />1 Mobilization, Staging &
<br />Stockpiling per Sections 7-8.4 & 9-
<br />3.4
<br />1 LS
<br />$100,000.00
<br />$100,000.00
<br />2 Temporary Traffic Control – Level
<br />1, per Section 600
<br />29 EA $1,200.00 $34,800.00
<br />3 Temporary Traffic Control – Level
<br />2, per Section 600
<br />23 EA $1,600.00 $36,800.00
<br />4 Temporary Traffic Control – Level
<br />3, per Section 600
<br />29 EA $1,900.00 $55,100.00
<br />5 Pipe Cleaning & CCTV Inspection
<br />, per section 500-1.1
<br />24,220 LF $3.00 $72,660.00
<br />6 Sheeting, Shoring & Bracing, per
<br />section 306-4
<br />1 LS $50,000.00 $50,000.00
<br />7 Unstable Bedding Material, per
<br />section 306-6.1
<br />300 LF $45.00 $13,500.00
<br />8 Trench Excavation & Backfill, 0’-
<br />5’ Depth, per sections 306-3, 306-
<br />115 LF $400.00 $46,000.00
<br />9 Trench Excavation & Backfill, 5’-
<br />8’ Depth, per sections 306-3, 306-
<br />1,187 LF $425.00 $504,475.00
<br />10 Trench Excavation & Backfill, 8’-
<br />11’ Depth, per sections 306-3,
<br />30 LF $450.00 $13,500.00
<br />11 Trench Excavation & Backfill, 11’-
<br />15’ Depth, per sections 306-3,
<br />20 LF $575.00 $11,500.00
<br />12 Restricted Access Excavation &
<br />Backfill by Hand & Small
<br />92 LF $500.00 $46,000.00
<br />13 Lateral Repair, 4-inch Pipeline
<br />Replacement, per section 306-7
<br />100 LF $130.00 $13,000.00
<br />14 Point Repair, 6-inch Pipeline
<br />Replacement, per section 306-7
<br />954 LF $145.00 $138,330.00
<br />15 Point Repair, 8-inch Pipeline
<br />Replacement, per section 306-7
<br />120 LF $150.00 $18,000.00
<br />16 Point Repair, 10-inch Pipeline
<br />Replacement, per section 306-7
<br />4 LF $160.00 $640.00
<br />17 Not Used $170.00 $0.00
<br />18 Reconnect Service Lateral to 6-
<br />inch Main Pipeline, per section
<br />93 EA $350.00 $32,550.00
<br />19 Reconnect Service Lateral to 8-
<br />inch Main Pipeline, per section
<br />13 EA $360.00 $4,680.00
<br />20 Install New Type A-2 Manhole, 0’-
<br />5’ Depth, per section 306-7
<br />6 EA $8,000.00 $48,000.00
<br />21 Install New Type A-2 Manhole, 5’-
<br />10’ Depth, per section 306-7
<br />18 EA $10,000.00 $180,000.00
<br />ENGINEER'S ESTIMATE
<br />PROJECT TITLE:
<br />PROJECT NO.:
<br />BID NO.:
<br />QUANTITY
<br />Sanitary Sewer Point Repair 2021
<br />2020.0120
<br />20-21.005
<br />
<br />EPS Inc. dba Express Plumbing
<br />307 N. Amphlett Boulevard
<br />San Mateo, CA 94401
<br />Phone: (650) 343-9477
<br />Fax: (650) 343-8256
<br />UNIT COST
<br />$100,000.00 $100,000.00
<br />$10,000.00 $290,000.00
<br />$16,000.00 $368,000.00
<br />$17,000.00 $493,000.00
<br />$2.50 $60,550.00
<br />$20,000.00 $20,000.00
<br />$210.00 $63,000.00
<br />$200.00 $23,000.00
<br />$220.00 $261,140.00
<br />$250.00 $7,500.00
<br />$280.00 $5,600.00
<br />$250.00 $23,000.00
<br />$300.00 $30,000.00
<br />$700.00 $667,800.00
<br />$700.00 $84,000.00
<br />$1,000.00 $4,000.00
<br />$0.00 $0.00
<br />$1,000.00 $93,000.00
<br />$1,000.00 $13,000.00
<br />$10,000.00 $60,000.00
<br />$11,000.00 $198,000.00
<br />ITEM COST
<br />This document is a summary of bids received for the subject project and are
<br />provided only as a convenience. Listing of a particular bid is not a finding that such
<br />bid has been found to be responsive or accepted as complete by the City. An award
<br />of contract, if any, is subject to approval of the City Council and/or the City Manager.
<br />Contractors should refer to the contract documents for bidding information.
<br />Bid Summary SS Point Repairs 2021.xlsx Page 9 of 12 Printed 2/2/2021 @ 2:21 PM
|