BID SUMMARY <br /> <br />BID OPENING Westland Contractors D'Arcy and Harty Construction, Inc Conquest Contractors <br />DATE: January 28, 2021 Date Approved:12/21/2020 3100 E. 10th Street, Unit A 1300 Carroll Avenue 1700 Neptune Drive <br />TIME: 3:00 pm Prepared by:J. O'Driscoll Oakland, CA 94601 San Francisco, CA 94124 San Leandro, CA 94577 <br />LOCATION: City Clerk's Office Phone: (510) 842-3663 Phone: (415) 822-5200 Phone: (510) 394-0033 <br />Fax: (510) 842-3846 Fax: (415) 822-0747 Fax: (415) 206-0528 <br />ITEM <br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST ITEM COSTITEM COST <br />ENGINEER'S ESTIMATE <br />ITEM COST <br />PROJECT TITLE: <br />PROJECT NO.: <br />BID NO.: <br />QUANTITY <br />Sanitary Sewer Point Repair 2021 <br />2020.0120 <br />20-21.005 <br />This document is a summary of bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is not a finding that such <br />bid has been found to be responsive or accepted as complete by the City. An <br />award of contract, if any, is subject to approval of the City Council and/or the City <br />Manager. Contractors should refer to the contract documents for bidding <br />information. <br />37 Landscape Removal and <br />Restoration, per sections 306- <br />13.8 <br />771 SF <br />$35.00 <br />$26,985.00 $10.00 $7,710.00 $5.00 $3,855.00 $13.00 $10,023.00 <br />38 Rehabilitate 6-inch Host Pipeline <br />with Cured-in-Place Pipeline, per <br />section 500-1.4 <br />2,907 LF <br />$45.00 <br />$130,815.00 $38.00 $110,466.00 $39.00 $113,373.00 $43.00 $125,001.00 <br />39 Rehabilitate 8-inch Host Pipeline <br />with Cured-in-Place Pipeline, per <br />section 500-1.4 <br />380 LF <br />$50.00 <br />$19,000.00 $47.00 $17,860.00 $40.00 $15,200.00 $48.00 $18,240.00 <br />40 Re-establish Service Lateral <br />Connections in CIPP <br />Rehabilitated Pipelines, per <br />Section 500-1.4.7 <br />113 EA <br />$700.00 <br />$79,100.00 $125.00 $14,125.00 $100.00 $11,300.00 $133.00 $15,029.00 <br />41 Replace and upsize 361 LF of 8- <br />inch Pipeline with New to 10-inch <br />pipeline by open trench Method, <br />including trench excavation, <br />backfill and surface restoration, <br />per Section 306-7 <br />1 LS <br />$245,000.00 <br />$245,000.00 $164,977.00 $164,977.00 $150,000.00 $150,000.00 $136,570.00 $136,570.00 <br />42 Work Site Safety, per Section 7- <br />10.4.1 <br />1 LS $25,000.00 $25,000.00 $10,000.00 $10,000.00 $5,000.00 $5,000.00 $4,030.00 $4,030.00 <br />0 UNIT $0.00 $0.00 $0.00 $0.00 <br />TOTAL BASE BID: <br />REQUIRED DOCUMENTATION: <br />Agreement to be Bound <br />$2,326,942.00 $1,874,058.00 <br />YES <br />NO <br />NO <br />YES <br />YES <br />YES <br />Bid Bond <br />San Leandro Local Business <br />Addendum #1 - 2 <br />$2,132,976.00 $2,388,711.00 <br />YES YES <br />NO YES <br />YES YES <br />YES YES <br />25 % Participation NO n/a <br />Good Faith Effort YES n/a <br />Bid Summary SS Point Repairs 2021.xlsx Page 3 of 12 Printed 2/2/2021 @ 2:21 PM