BID SUMMARY
<br />
<br />BID OPENING Westland Contractors D'Arcy and Harty Construction, Inc Conquest Contractors
<br />DATE: January 28, 2021 Date Approved:12/21/2020 3100 E. 10th Street, Unit A 1300 Carroll Avenue 1700 Neptune Drive
<br />TIME: 3:00 pm Prepared by:J. O'Driscoll Oakland, CA 94601 San Francisco, CA 94124 San Leandro, CA 94577
<br />LOCATION: City Clerk's Office Phone: (510) 842-3663 Phone: (415) 822-5200 Phone: (510) 394-0033
<br />Fax: (510) 842-3846 Fax: (415) 822-0747 Fax: (415) 206-0528
<br />ITEM
<br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST ITEM COSTITEM COST
<br />ENGINEER'S ESTIMATE
<br />ITEM COST
<br />PROJECT TITLE:
<br />PROJECT NO.:
<br />BID NO.:
<br />QUANTITY
<br />Sanitary Sewer Point Repair 2021
<br />2020.0120
<br />20-21.005
<br />This document is a summary of bids received for the subject project and are
<br />provided only as a convenience. Listing of a particular bid is not a finding that such
<br />bid has been found to be responsive or accepted as complete by the City. An
<br />award of contract, if any, is subject to approval of the City Council and/or the City
<br />Manager. Contractors should refer to the contract documents for bidding
<br />information.
<br />37 Landscape Removal and
<br />Restoration, per sections 306-
<br />13.8
<br />771 SF
<br />$35.00
<br />$26,985.00 $10.00 $7,710.00 $5.00 $3,855.00 $13.00 $10,023.00
<br />38 Rehabilitate 6-inch Host Pipeline
<br />with Cured-in-Place Pipeline, per
<br />section 500-1.4
<br />2,907 LF
<br />$45.00
<br />$130,815.00 $38.00 $110,466.00 $39.00 $113,373.00 $43.00 $125,001.00
<br />39 Rehabilitate 8-inch Host Pipeline
<br />with Cured-in-Place Pipeline, per
<br />section 500-1.4
<br />380 LF
<br />$50.00
<br />$19,000.00 $47.00 $17,860.00 $40.00 $15,200.00 $48.00 $18,240.00
<br />40 Re-establish Service Lateral
<br />Connections in CIPP
<br />Rehabilitated Pipelines, per
<br />Section 500-1.4.7
<br />113 EA
<br />$700.00
<br />$79,100.00 $125.00 $14,125.00 $100.00 $11,300.00 $133.00 $15,029.00
<br />41 Replace and upsize 361 LF of 8-
<br />inch Pipeline with New to 10-inch
<br />pipeline by open trench Method,
<br />including trench excavation,
<br />backfill and surface restoration,
<br />per Section 306-7
<br />1 LS
<br />$245,000.00
<br />$245,000.00 $164,977.00 $164,977.00 $150,000.00 $150,000.00 $136,570.00 $136,570.00
<br />42 Work Site Safety, per Section 7-
<br />10.4.1
<br />1 LS $25,000.00 $25,000.00 $10,000.00 $10,000.00 $5,000.00 $5,000.00 $4,030.00 $4,030.00
<br />0 UNIT $0.00 $0.00 $0.00 $0.00
<br />TOTAL BASE BID:
<br />REQUIRED DOCUMENTATION:
<br />Agreement to be Bound
<br />$2,326,942.00 $1,874,058.00
<br />YES
<br />NO
<br />NO
<br />YES
<br />YES
<br />YES
<br />Bid Bond
<br />San Leandro Local Business
<br />Addendum #1 - 2
<br />$2,132,976.00 $2,388,711.00
<br />YES YES
<br />NO YES
<br />YES YES
<br />YES YES
<br />25 % Participation NO n/a
<br />Good Faith Effort YES n/a
<br />Bid Summary SS Point Repairs 2021.xlsx Page 3 of 12 Printed 2/2/2021 @ 2:21 PM
|