My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2021 0419
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0419
>
8D Consent 2021 0419
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 7:43:19 PM
Creation date
4/14/2021 7:43:15 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
4/19/2021
Retention
PERM
Document Relationships
Reso 2021-063 Spencon Construction Contract
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: April 19, 2021 <br />Staff Report <br />Agenda Section:File Number:21-150 CONSENT CALENDAR <br />Agenda Number:8.D. <br />TO:City Council <br />FROM:Fran Robustelli <br />Interim City Manager <br />BY:Keith Cooke <br />Engineering & Transportation Director <br />FINANCE REVIEW:Susan Hsieh <br />Finance Director <br />TITLE:Staff Report for a City of San Leandro City Council Resolution to Award a <br />$550,352 Construction Contract to Spencon Construction, Inc. for the Curb Ramp <br />Upgrades 2021 Project, Project No. 2021.0070; to Authorize the City Manager to <br />Negotiate and Approve Individual Change Orders Up to 5% (or $27,518) of the <br />Original Contract Amount; and to Authorize the City Manager to Negotiate and <br />Approve Change Orders up to a Cumulative Value not to Exceed 15% (or <br />$82,553) of the Original Contract Amount <br />SUMMARY AND RECOMMENDATIONS <br />This contract provides for the installation or upgrade of approximately ninety concrete curb ramps <br />in the 2021 Asphalt Maintenance Zone work area. The asphalt maintenance treatment contract <br />work will be awarded as a separate construction contract. <br />Staff recommends the following actions: <br />·Award a construction contract to Spencon Construction, Inc. in the amount of $550,352 for <br />the Curb Ramp Upgrades 2021 Project, Project No. 2021.0070; <br />·Authorize the City Manager to negotiate and approve individual change orders up to 5% <br />(or $27,518) of the original contract amount; and <br />·Authorize the City Manager to negotiate and approve change orders up to a cumulative <br />value of 15% (or $82,553) of the original contract amount. <br />BACKGROUND <br />The Americans with Disabilities Act (ADA) mandates construction of curb ramps at street <br />intersections when roadway pavement is replaced, overlaid, or treated with a cape seal. This <br />contract will install ramps at locations scheduled for pavement work as part of the upcoming <br />Annual Street Sealing Fiscal Year 2019-2021 project. The contract will install new ramps at <br />locations where none exist and upgrade existing non-compliant ramps. This contract will install <br />upgrades to approximately ninety (90) concrete curb ramps. <br />Page 1 City of San Leandro Printed on 4/14/2021 <br />96
The URL can be used to link to this page
Your browser does not support the video tag.