My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2021 0419
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0419
>
8D Consent 2021 0419
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 7:43:19 PM
Creation date
4/14/2021 7:43:15 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
4/19/2021
Retention
PERM
Document Relationships
Reso 2021-063 Spencon Construction Contract
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
BID SUMMARY <br />BID OPENING Spencon Construction FBD Vanguard Kerex Engineering, Inc. <br />DATE: March 17, 2021 3170 Crow Canyon Pl., #250 550 Greenville Road 4941 Pacheco Boulevard <br />TIME: 3:00 p.m. San Ramon, CA 94583 Livermore CA 94550 Martinez, CA 94553 <br />LOCATION: City Clerk's Office Phone: (925) 984-2581 Phone: (925) 245-1300 Phone: (925) 387-8913 <br />Fax: (925) 984-2583 Fax: (925) 245-1007 Fax: (925) 387-0853 <br />ITEM <br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COSTQUANTITYITEM COST ITEM COST ITEM COST <br />PROJECT TITLE:Curb Ramp Upgrades 2021 <br />PROJECT NO.: <br />BID NO.: <br />ENGINEER'S ESTIMATE <br />2021.0070 <br />20-21.012 <br />Prepared by: J. O'Driscoll <br />Date Approved: 2/10/2021 <br />REQUIRED DOCUMENTATION: <br />Agreement to be Bound <br />SUBCONTRACTORS: <br />NOTES: <br />Reviewed by:John O’Driscoll Date:3/18/2021 <br />John O'Driscoll, Project Manager <br />Reviewed by:Austine Osakwe Date:3/18/2021 <br />Austine Osakwe, Senior Engineer <br />TPR Traffic Solutions Farwest Safety, Inc.Chrisp Company <br />YES YES <br />25 % Participation NO NO NO <br />San Leandro Local Business <br />YES <br />Good Faith Effort TBD TBD TBD <br />NO NO NO <br />Bid Bond <br />YES YES YES <br />All City TruckingChrisp Company <br />Addendum N/A N/A N/A <br />Bid Summary Curb Ramp Upgrades 2021.xlsx Page 3 of 6 Printed 3/19/2021 @ 11:12 AM102
The URL can be used to link to this page
Your browser does not support the video tag.