Laserfiche WebLink
Description Reference Proposed Fee Explanation <br />ENGINEERING AND TRANSPORTATION DEPARTMENT <br />1 General Encroachment SLMC §5-1-225 <br />A. Permit <br />B.1 Inspection/Plan Review/Permit Issuance <br />B.2 Permit + Inspection Fee <br />C. Parklet Program <br />-- Application Fee <br />-- Design Review Deposit <br />-- Restoration Deposit <br />-- Inspection <br />-- Plan Review <br />D. Inspection/Security/Plan Review Deposit <br />E. No Permit Penalty Fee <br />F. Annual Sidewalk Repair Program - Sidewalk Inspection SLAC §8.1.120 <br />G. Agreement <br />H. Overhead Banner Installation and Removal <br />I. News rack Permit <br /> Maintenance Deposit <br />2 Subdivision: <br />A. Parcel Map Waiver/Lot Line Adjustment/ or Certificate of Compliance <br />B. Parcel Map <br />C. Tentative/Final Map <br />D. Subdivision Improvement Plan Review <br />3 Building Permits: <br />A. Plan Review <br />B. Agreement Preparation <br />4 Large Format Copies (see also Community Development Dept.) <br />5 Park Facilities Development Impact Fees (2)SLMC §7-13-100 <br /> Park Land Acquisition Fee:SLAC §8.8.100 <br /> Single Family SLMC §7-1-820 $17,523 1.3% increase - Shelter component of <br />SF Bay Area CPI <br /> Multi-Family $15,316 1.3% increase - Shelter component of <br />SF Bay Area CPI <br /> Special Unit $7,659 1.3% increase - Shelter component of <br />SF Bay Area CPI <br /> Accessory Dwelling Unit (3)$6,638 maximum (No fee when < 750 Sq. Ft.)Adjusted by ratio of occupant number <br />of SFR to ADU <br /> Park Improvement Fee: <br /> Single Family $2,787 2.1% increase - Engineering News <br />Records Construction Cost Index <br /> Multi-Family $2,436 2.1% increase - Engineering News <br />Records Construction Cost Index <br /> Special Unit $1,218 2.1% increase - Engineering News <br />Records Construction Cost Index <br /> Accessory Dwelling Unit (3)$1,055 maximum (No fee when < 750 Sq. Ft.)Adjusted by ratio of occupant number <br />of SFR to ADU <br /> Total Acquisition and Improvement Fee: <br /> Single Family $20,310 1.3% Shelter component of SF Bay <br />Area CPI & 2.1% Engineering News <br />Records Construction Cost Index Multi-Family $17,752 1.3% Shelter component of SF Bay <br />Area CPI & 2.1% Engineering News <br />Records Construction Cost Index Special Unit $8,877 1.3% Shelter component of SF Bay <br />Area CPI & 2.1% Engineering News <br />Records Construction Cost Index Accessory Dwelling Unit (3)$7,693 maximum (No fee when < 750 Sq. Ft.)Adjusted by ratio of occupant number <br />of SFR to ADU <br />$20,031 <br />$17,509 <br />$8,755 <br />$7,588 maximum (No fee when < 750 sq. ft.) <br />$2,730 <br />$2,387 <br />$1,193 <br />$1,034 maximum (No fee when < 750 sq. ft.) <br />$17,301 <br />$15,122 <br />$7,562 <br />$6,554 maximum (No fee when < 750 sq. ft.) <br />Direct Costs (1); $65.00 minimum <br />Direct Costs (1) <br />$10.00 for first sheet and $2.00 for each sheet thereafter plus Direct Costs (1) <br />Direct Costs (1); $1,600 initial deposit <br />Direct Costs (1); $4,000 plus $100 per lot initial deposit <br />Direct Costs (1) <br />Direct Costs (1) <br />Direct Costs (1) <br />$150.00 <br />$55.00 + $5.50 per news rack <br />$100.00 + $5.00 per news rack <br />$129.00/hour <br />$157.00/hour <br />As determined by City Engineer to insure prompt, high quality repairs and to cover <br />estimated inspection costs and plan review cost. <br />Double Inspection Fee and Permit Fee <br />Cost of work performed by the City contractor or as described in SLAC §8.1.120 <br />"Repairs" <br />Current Fee <br />$65.00 <br />Inspection = $129.00/hour; <br />Plan Check Engineer = $157.00/hour; <br />Technical Assistance = $106.00/hour; <br />Senior Engineer = $192.00/hour; <br />Principal Engineer = $211.00/hour <br />Direct Costs for Plan Check Services Consultant <br />$65 (Permit) + 1.5 hours (Minimum Inspection Time) <br />(estimated inspection requirements = 1.5 hours determined by City Engineer) <br />$150 <br />As determined by City Engineer <br />$2,500 <br />36