Laserfiche WebLink
DescriptionReferenceProposed FeeExplanationENGINEERING AND TRANSPORTATION DEPARTMENT 1 General EncroachmentSLMC §5-1-225A. PermitB.1 Inspection/Plan Review/Permit IssuanceB.2 Permit + Inspection Fee C. Parklet Program-- Application Fee-- Design Review Deposit-- Restoration Deposit-- Inspection-- Plan ReviewD. Inspection/Security/Plan Review DepositE. No Permit Penalty FeeF. Annual Sidewalk Repair Program - Sidewalk InspectionSLAC §8.1.120G. AgreementH. Overhead Banner Installation and RemovalI. News rack Permit Maintenance Deposit2 Subdivision:A. Parcel Map Waiver/Lot Line Adjustment/ or Certificate of ComplianceB. Parcel MapC. Tentative/Final MapD. Subdivision Improvement Plan Review3 Building Permits:A. Plan ReviewB. Agreement Preparation4 Large Format Copies (see also Community Development Dept.)5 Park Facilities Development Impact Fees (2)SLMC §7-13-100 Park Land Acquisition Fee:SLAC §8.8.100 Single FamilySLMC §7-1-820$17,5231.3% increase - Shelter component of SF Bay Area CPI Multi-Family$15,3161.3% increase - Shelter component of SF Bay Area CPI Special Unit $7,6591.3% increase - Shelter component of SF Bay Area CPI Accessory Dwelling Unit (3)$6,638 maximum (No fee when < 750 Sq. Ft.)Adjusted by ratio of occupant number of SFR to ADU Park Improvement Fee: Single Family$2,7872.1% increase - Engineering News Records Construction Cost Index Multi-Family$2,4362.1% increase - Engineering News Records Construction Cost Index Special Unit $1,2182.1% increase - Engineering News Records Construction Cost Index Accessory Dwelling Unit (3)$1,055 maximum (No fee when < 750 Sq. Ft.)Adjusted by ratio of occupant number of SFR to ADU Total Acquisition and Improvement Fee: Single Family$20,3101.3% Shelter component of SF Bay Area CPI & 2.1% Engineering News Records Construction Cost Index Multi-Family$17,7521.3% Shelter component of SF Bay Area CPI & 2.1% Engineering News Records Construction Cost Index Special Unit $8,8771.3% Shelter component of SF Bay Area CPI & 2.1% Engineering News Records Construction Cost Index Accessory Dwelling Unit (3)$7,693 maximum (No fee when < 750 Sq. Ft.)Adjusted by ratio of occupant number of SFR to ADU$20,031$17,509$8,755$7,588 maximum (No fee when < 750 sq. ft.)$2,730$2,387$1,193$1,034 maximum (No fee when < 750 sq. ft.)$17,301$15,122$7,562$6,554 maximum (No fee when < 750 sq. ft.)Direct Costs (1); $65.00 minimumDirect Costs (1)$10.00 for first sheet and $2.00 for each sheet thereafter plus Direct Costs (1)Direct Costs (1); $1,600 initial depositDirect Costs (1); $4,000 plus $100 per lot initial depositDirect Costs (1)Direct Costs (1)Direct Costs (1)$150.00 $55.00 + $5.50 per news rack$100.00 + $5.00 per news rack$129.00/hour$157.00/hourAs determined by City Engineer to insure prompt, high quality repairs and to cover estimated inspection costs and plan review cost.Double Inspection Fee and Permit FeeCost of work performed by the City contractor or as described in SLAC §8.1.120 "Repairs"Current Fee$65.00 Inspection = $129.00/hour;Plan Check Engineer = $157.00/hour;Technical Assistance = $106.00/hour;Senior Engineer = $192.00/hour;Principal Engineer = $211.00/hourDirect Costs for Plan Check Services Consultant$65 (Permit) + 1.5 hours (Minimum Inspection Time) (estimated inspection requirements = 1.5 hours determined by City Engineer)$150As determined by City Engineer$2,50063