My WebLink
|
Help
|
About
|
Sign Out
Home
Climatec_Installation_Agreement 12102020
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2020
>
Climatec_Installation_Agreement 12102020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 10:36:22 AM
Creation date
5/26/2021 10:35:33 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
12/10/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Any SCADA upgrades <br /> <br />Biogas to RNG (Renewable Natural Gas) System <br /> <br />Provide and install necessary plant infrastructure to produce Renewable Natural Gas from <br />the current facility biogas supply (up to 100 cubic feet per minute).Scope of Work includes: <br />• Engineering design, including design for the flare <br />• Demolition, removal and disposal of the existing, mothballed gas <br />conditioning system located between the FOG building and Digester #4 <br />Control Building <br />• Site preparation <br />• Equipment pads as required <br />• Provide and install one (1) new gas upgrading system consisting of: <br />• Siloxane removal <br />• H2S removal <br />• Moisture removal <br />• CO2 removal <br />• Provide and install one (1) RNG compressor <br />• Provide and install one (1) 500 gallon intermediate gas storage tank <br />• Provide and install one (1) filling station for the mobile storage <br />• Provide and install necessary RNG piping required for the operational <br />system, including: <br />• Interconnection piping between RNG equipment <br />• Piping to new flare location <br />• Install one (1) Flare (Flare equipment provided by the City) <br />• Provide and install one (1) tube trailer for RNG storage and <br />transportation for offsite sale <br />• Electrical disconnect and reconnect <br />• Electrical conduit and required panels/connections <br />• SCADA programming for the addition of this equipment. <br />• Start-up and testing of equipment and system operation. <br />• Bay Area Air Quality Management District permit update coordination <br />o Scope Assumptions: <br />• The existing FOG control panel can be reused for sending communication <br />signals to plant SCADA system <br />o Scope Exclusions: <br />• Controls routing between the FOG building and nearest Programmable <br />Logic Controller (PLC) cabinet (see assumption above) <br />• Flare equipment (to be provided by the City) <br />• Any SCADA upgrades <br />Digester Mixer Replacement <br /> Provide and install two (2) new high efficiency propeller mixers in Digester #4. <br />o Scope of Work Includes: <br />DocuSign Envelope ID: 1DDC1773-ED91-404B-97DD-AC3EFDBAD0DD
The URL can be used to link to this page
Your browser does not support the video tag.