My WebLink
|
Help
|
About
|
Sign Out
Home
Climatec_Installation_Agreement 12102020
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2020
>
Climatec_Installation_Agreement 12102020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 10:36:22 AM
Creation date
5/26/2021 10:35:33 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
12/10/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />TECHNICAL QUOTATION REMARKS <br />SULZER ABS TURBOCOMPRESSOR HST <br /> <br />Sulzer Pumps <br />Wastewater Solutions <br />ABS USA <br />140 Pond View Drive <br />Meriden, CT 06450 <br /> <br /> <br />Comments & Exceptions: <br />1) Above items only; additional accessories available upon request. <br />2) No special tools are required <br />3) Sulzer|ABS's standard product is offered. <br />4) Anchor bolts are not included <br />5) Supply and installation of interconnecting communications cabling between each <br />turbocompressor and the MCU (if supplied). <br />6) Installation of compressor units, accessories and associated pipe work <br />7) Supply and installation of electrical power and signal cables to each turbocompressor <br />and the MCU (if supplied) <br />8) Provision of any further instrumentation other than that contained within each <br />turbocompressor or the MCU (if supplied). This also excludes the pressure or D.O. <br />transducer required to generate the 4-20ma signal for compressor control. <br />9) Pipe insulation as deemed necessary by the client to prevent contact with hot pipes. <br />10) Reasonable access to the site and working area to enable continuous installation. <br />11) Free access to facilities <br />12) The compressors are to be installed in a compressor room constructed by others. <br />13) The compressor room floor will be flat and level to standard civil tolerances. <br />14) That the Sulzer|ABS Turbocompressor HST can be off loaded and placed directly into the <br />compressor building <br />15) Cable tray or ducts to each compressor for the communications cabling will be supplied <br />and installed by others. <br />16) The above price does not include sales tax or other costs unless specifically included in <br />this proposal. <br /> <br />This quote and any accompanying documents contain information belonging to Sulzer|ABS which <br />is confidential and legally privileged. This information is intended only for the use of the individual <br />or entity to whom this transmission was sent as indicated above. Copying or disseminating this <br />communication without the express permission of Sulzer|ABS is prohibited. If you are not the <br />intended recipient, any disclosure, copying, distribution, or action taken in reliance on the <br />contents of the information contained in this transmission is strictly prohibited. <br /> <br />Appendix <br />1) Performance Graph <br />2) Technical Data Sheet <br />3) Turbocompressor Control Schematic <br />4) Master Control Unit Options (if provided) <br />5) Typical Sulzer|ABS Turbocompressor HST layout drawing <br />6) Compressor Test Code Comparison <br />7) Warranty <br />DocuSign Envelope ID: 1DDC1773-ED91-404B-97DD-AC3EFDBAD0DD
The URL can be used to link to this page
Your browser does not support the video tag.