My WebLink
|
Help
|
About
|
Sign Out
Home
NPSA West Coast Arborist Eucalyptus Removal 05052021
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2021
>
NPSA West Coast Arborist Eucalyptus Removal 05052021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2021 10:39:14 AM
Creation date
5/26/2021 10:39:06 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/5/2021
Retention
PERM
Document Relationships
Reso 2021-054 Shoreline Fund Balance Appropriation
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Non-Professional Services Agreement between May 3, 2021 <br />City of San Leandro and West Coast Arborist, Inc.— Exhibit A Page 2 of 3 <br /> <br />Holes/ruts made in lawns, regardless of size, shall be filled with topsoil and seeded <br />with a turf grass lawn mix or sod, as requested by the Parks Supervisor. Sidewalks, <br />curbs, walkways, irrigation boxes and irrigation heads shall always be protected from <br />the impact of falling wood by use of tree or limb ground supports. Ropes or other <br />mechanical devices shall be used to lower all limbs of sufficient size that may cause <br />damage to other trees or surrounding property. <br /> <br />6. DAYS OF WORK: All trimming is to be done between the hours of 7:00 A.M. and <br />5:00 P.M., Monday through Friday, unless prior approval is granted by the Street <br />Supervisor or his designated representative. <br /> <br />The following are the designated City holidays: <br />January 1 (New Year’s Day). <br />The third Monday in January (Martin Luther King’s Birthday). <br />The second Monday in February (Lincoln’s Birthday). <br />The third Monday in February (Washington’s Birthday). <br />The last Monday in May (Memorial Day). <br />July 4 (Independence Day). <br />The first Monday in September (Labor Day). <br />November 11 (Veterans’ Day). <br />The fourth Thursday in November (Thanksgiving Day). <br />The day after Thanksgiving Day. <br />December 24 (Christmas Eve). <br />December 25 (Christmas Day). <br />December 31 (New Year’s Eve). <br /> <br />7. LIQUIDATED DAMAGES: Failure to start and complete all work specified within the <br />time allowed shall constitute material breach of contract. The “time allowed” will be <br />calculated from the date of the Purchase Order issuance through the Project <br />Delivery as indicated. Failure of Contractor to complete the work within the time <br />allowed will result in damages, and for each consecutive day in excess, the <br />contractor shall pay to the City the sum of $100.00 per calendar day. Such amount <br />shall not be construed as a penalty but as a minimum value of liquidated damages <br />that may be deducted from payment due to the contractor if such delay occurs. <br /> <br />8. LICENSES: Contractor must possess current City business license, California <br />Contractor’s License and DIR Contractor Registration for duration of contract. <br /> <br />DocuSign Envelope ID: 28117416-CABF-49E0-8654-D1F940DA50B6
The URL can be used to link to this page
Your browser does not support the video tag.