My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2021 0607
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0607
>
5A Public Hearings 2021 0607
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2021 10:06:20 AM
Creation date
6/4/2021 10:05:51 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/7/2021
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Table C-1 CUPA and PRETREATMENT PROGRAM FEE LIST <br />Fee Name Fee Applicability Description of Service Provided <br />Underground Hazardous <br />Materials Storage <br />Underground Hazardous <br />Materials Storage Annual <br />Operating Permit - Each Tank. <br />Includes travel time to and from site. Performs inspections of facilities to assure compliance with applicable codes, regulations and laws; Reviews <br />Hazardous Materials Business Plans, Designated Operator reports, alarm histories, secondary containment testing, and functional testing of <br />monitoring systems and shut-offs; Prepares inspection reports and enforcement actions; Provides technical assistance and outreach. Maintains <br />database for CUPA compliance, monitoring, and enforcement and reviews CERS submittals. <br />Aboveground Storage <br />Tank Installation <br />Aboveground Storage Tank <br />Installation - First Tank. <br />Includes travel time to and from site. Performs plan review for installation permit; Performs inspections to verify that installation complies with <br />applicable codes, regulations and laws; Witnesses pressure testing of tank, piping, and containment; Reviews Hazardous Materials Business Plans <br />and Spill Prevention Control and Countermeasures Plans; Prepares inspection reports and plan review comments and conditions; Provides technical <br />assistance. Maintains database for CUPA compliance, monitoring, and enforcement and reviews CERS submittals. <br />Underground Storage <br />Tank Installation <br />Underground Storage Tank <br />Installation <br />Includes travel time to and from site. Performs plan review for installation permit; Performs inspections to verify that installation complies with <br />applicable codes, regulations and laws; Witnesses pressure testing of tank, piping, and containment; Reviews Hazardous Materials Business Plans; <br />Prepares and issues operating permit; Prepares inspection reports and plan review comments and conditions; Provides technical assistance. <br />Maintains database for CUPA compliance, monitoring, and enforcement and reviews CERS submittals. <br />Underground Storage <br />Tank Removal <br />Underground Storage Tank <br />Removal, Repair, Alterations <br />Includes travel time to and from site. Performs application review for removal permit; Performs inspections to verify that removal complies with <br />applicable codes, regulations and laws; Witnesses all removal phases and sampling; Reviews removal report and analytical data; Prepares and <br />submits Unauthorized Release Report to the State Water Resources Control Board; Prepares inspection reports and updates the California <br />Environmental Reporting System; Provides technical assistance. Maintains database for CUPA compliance, monitoring, and enforcement and <br />reviews CERS submittals. <br />Page 5 of 767
The URL can be used to link to this page
Your browser does not support the video tag.