Laserfiche WebLink
File Number: 21-276 <br />Pool Resurfacing, and the Family Aquatics Center Competition Pool projects. <br />Applicable General Plan Policies <br />·Policy OSC-1.2 Park Maintenance. Provide for the regular, systematic maintenance of <br />San Leandro’s parks and recreational facilities to prevent deterioration, ensure public <br />safety, and permit continued public use and enjoyment. <br />·Policy OSC-4.1 Joint Use Agreements. Promote joint use agreements between the City <br />and the San Leandro Unified School District and San Lorenzo School District to maximize <br />public access to school recreational facilities and grounds during non-school hours. <br />Permits and/or Variances Granted <br />City Building Permit B19-0925 and Alameda County Health Department Permit SR 0038325 <br />have been issued for this project. <br />Code Compliance Review <br />Installed equipment shall comply with all applicable codes and will be inspected for code <br />compliance as part of the required building permits. <br />Summary of Public Outreach Efforts <br />·An open house for the public was held at Roosevelt Elementary School on March 27, 2019 <br />between 6:30pm and 8:30pm to present the new facility design. Four information stations <br />were set up at the meeting with Engineering and Recreation staff personnel available to <br />answer inquiries and provide comment cards for their opinions. <br />·Notices regarding the start of construction were distributed to the neighborhood the week <br />of January 20, 2020 with City staff contact information. <br />Fiscal Impacts <br />The cost of the proposed Consulting Services Agreement with RCraneCx is $65,100 and is <br />included in the amount listed below for Utilities, Permits, and Specialty construction contracts. <br />The total estimated project cost is as follows: <br />Design, Permit, and Bid: $621,357 <br />Demolition Contract:$158,000 <br />Original Construction Contract:$6,222,450 <br />Allowance for current construction contract changes:$331,000 <br />Utilities, Permits, and Specialty construction contracts:$540,000 <br />Construction Management and Inspection (Staff and Consultants):$750,000 <br />Allowance for Fixtures, Furnishings and Equipment Allowance $42,193 <br />Construction Contingency Allowance for future changes: $50,000 <br />Project Total $8,715,000 <br />Page 3 City of San Leandro Printed on 6/23/2021 <br />374